Skip to main content

Major German road contract awarded

A major road contract has been awarded close to Hesse in Germany.
By MJ Woof September 2, 2020 Read time: 2 mins
STRABAG is one of the partners in a major project in Hesse, Germany – image © courtesy of STRABAG

The contract for a major road project in Germany has been awarded for the A49 highway. The work will be carried out under the PPP model and is located close to Hesse.

The project is a design-build-finance-operate-maintain contract for A49 highway between Fritzlar and Ohmtal interchange. This 62km deal will be handled jointly by STRABAG Großprojekte and LEONHARD WEISS to close the gap between Schwalmstadt and the Ohmtal interchange

The project has a value of over € 700 million. The deal is for the construction of a 31km long section of the A49 highway between Schwalmstadt and the Ohmtal interchange in northern and central Hesse. The PPP project also includes the design and proportionate financing as well as the maintenance and operation of the motorway over a distance of nearly 62km between the Fritzlar junction and the Ohmtal A5/A49 interchange.

The client is the Federal Republic of Germany, represented by the State of Hesse, represented by Deutsche Einheit Fernstraßenplanungs- und -bau (DEGES). The consortium A 49 Autobahngesellschaft has been established for the project and is held 50:50 between STRABAG Infrastrukturprojekt and Meridiam Investments SAS. The PPP contract is for a 30-year concession.

Financing has been provided by the KfW IPEX-Bank (Germany), the European Investment Bank (EIB), MEAG (Germany) and ČSOB (Czech Republic, part of the Belgian KBC Group). In all the project will cost around €1.3 billion.

“We are pleased about the renewed trust in our ability to successfully realise large infrastructure projects in public-private partnerships, something we are already demonstrating in Germany with the A8 and A5 motorways,” said Thomas Birtel, CEO of STRABAG.

The A49 between Fritzlar and the Ohmtal interchange is divided into four sections. The first section to the Neuental junction is already open to traffic. The second section to the Schwalmstadt junction is currently under construction by HessenMobil. Realisation of the new sections three and four, from Schwalmstadt over the Stadtallendorf-Nord junction to the Ohmtal interchange, should begin in September 2020. The contract includes upgrading the A5 along a 1.5km section at the Ohmtal intersection. The main construction works are scheduled for completion in the third quarter of 2024.

For more information on companies in this article

Related Content

  • Official sale of M6 Toll to be launched in September
    August 23, 2016
    An information memorandum that will officially launch the sale of M6 Toll, the UK’s only toll road, will be sent out to interested buyers in September. No date is set for sending out the IM, according to sources, but the 43km six-lane asset around the English city of Birmingham could be going for slightly less after the UK’s European Union referendum vote in June. The result of the so-called Brexit – ‘British exit’ of the EU – referendum was won by the no-to-Europe side and the UK is now setting up t
  • Los Angeles County opts for Iteris bus signal priority
    November 6, 2013
    Building on multi-modal transit services provided over the past ten years, Iteris is to provide a multi-jurisdiction bus traffic signal priority system (BSP) for Torrance Transit’s Rapid Line in Los Angeles County, California. The US$2.2 million contract includes the design, procurement, deployment, and on-going operation and maintenance of a multi-jurisdiction BSP at 83 signalised intersections. The BSP system utilises existing on-bus systems that incorporate GPS-based automatic vehicle location equipme
  • Bosnia road corridor contract
    March 21, 2019
    The contract for the first stage of the Corridor 5C project for Bosnia has been signed. This 48km section of Corridor 5 will itself be constructed in four sections and is expected to cost more than €500 million. Funding for these four stages of the Corridor 5 project is being provided by the European Bank for Reconstruction and Development (EBRD) and the European Investment Bank (EIB), each of which will fund two stages.
  • Bids in for Estonia’s Pärnu to Uulu road
    May 31, 2022
    Six companies are bidding for a key road project in Estonia: Verston, Nordecon, GRK, TREV-2, KMG and TREF Nord.