Skip to main content

Machinery moves on site for New Zealand’s Kapiti Coast expressway

Onsite work has started in the Kapiti Coast region on the Otaki-Peka Peka Expressway, part of the greater Wellington Northern Corridor project. Simon Bridges, New Zealand’s transport minister, recently turned the first sod on the US$175 million project. Travel times should be improved between Port of Wellington, hospitals, Wellington’s central business district and ferry terminals. The 110km Wellington Northern Corridor largely follows the current state highway route from the airport to Linden, near Tawa. F
July 11, 2017 Read time: 2 mins

Onsite work has started in the Kapiti Coast region on the Otaki-Peka Peka Expressway, part of the greater Wellington Northern Corridor project.

Simon Bridges, New Zealand’s transport minister, recently turned the first sod on the US$175 million project. Travel times should be improved between Port of Wellington, hospitals, Wellington’s central business district and ferry terminals.

The 110km Wellington Northern Corridor largely follows the current state highway route from the airport to Linden, near Tawa. From Tawa new roads will progressively be constructed to provide an expressway-style journey to north of Levin. The corridor is made up of eight different sections and will provide for at least two lanes of traffic in either direction divided by a central barrier.

The Wellington Northern Corridor from Levin to Wellington Airport is one of the seven Roads of National Significance. Roads of National Significance are essential state highways that the Government has identified because they require upgrading. The new SH1 route will be a mixture of new divided four-lane highway sections and improvements to the existing network.

The corridor’s sections are Mount Victoria Tunnel duplication, tunnel-to tunnel inner-city transport improvements, Terrace Tunnel duplication, Smart Motorway, Transmission Gully, Mackays to Peka Peka, Peka Peka to Otaki Expressway and finally Otaki to north of Levin.

Related Content

  • A new tolled highway brings change for Austin, Texas
    February 10, 2020
    A new highway section in Austin, Texas marks a major departure for the southern US city
  • New Zealand highway project opening date set
    February 25, 2022
    The opening date has been set for a major New Zealand highway project.
  • New Zealand tunnel project
    May 23, 2012
    New Zealand’s Waterview tunnel project in Auckland will provide a key link in, boosting capacity and safety while reducing congestion and journey times. A consortium will handle the work for the Waterview Connection road, in a deal worth $1.15 billion (NZ$1.4 billion). The Well Connected consortium includes local company Fletcher Construction as well as other New Zealand and overseas firms. The deal is of note as it will be New Zealand’s single largest highway project and work is due to commence in November
  • New Zealand motorway project opening delayed
    September 6, 2019
    Further technical issues are bringing a further delay to the opening of New Zealand’s Transmission Gully Motorway. Costing US$547.3 million (NZ$850 million), the new route lies to the north of the city of Wellington. The work for the project was delayed first by an earthquake, which struck the area in November 2016. However this new delay is due to a combination of poor weather, which has resulted in delays onsite, as well as a greater than expected volume of earthmoving work being required. The route had p