Skip to main content

Loans approved for Mali road development

Loans have been approved for road development work in Mali.
By MJ Woof April 3, 2020 Read time: 1 min
Sandwiched in between Algeria, Niger, Burkina Faso, Ivory Coast, Guinea, Senegal and Mauretania, landlocked Mali depends heavily on its transport connections – image © courtesy of Rosevite2000, Dreamstime.com


Loans will be used to pay for work to develop a stretch of the Trans-Sahara road in Mali. The African Development Bank and the African Development Fund are providing the necessary loans. The Mali Government has given approval for the legal structure covering the US$32 million loan package being provided.

The funding package will help to pay for work on a 285km stretch of the route in Mali. Building the Trans-Sahara route is of key importance for North and West Africa. The road link will provide direct transport connections for six nations, improving transport between Algeria’s capital Algiers and Nigeria’s capital, Abuja, and its economic centre, Lagos. However, improvements to the Trans-Sahara route will help deliver an economic boost to numerous neighbouring nations also.

Related Content

  • Investment for Brazil’s Sao Paulo ring road
    June 8, 2012
    A new loan has been approved that will help finance works on the northern stretch of the Sao Paulo ring road in Brazil. The US$1.15 billion loan is being provided by the Inter-American Development Bank (IADB). Approval for the IADB loan has come from Brazil’s Committee for Economic Affairs (CAE) at Brazil's Senate. The loan will finance construction of the Rodoanel Norte stretch of the ring road. This measures some 44km long and will connect with the west and east sections of the ring road as well as linkin
  • A key section of highway is now open in Romania
    July 26, 2012
    In Romania the northern section of the bypass around the city of Constanta is open to traffic. The bypass forms part of the Pan-European Road Corridor IV and work on this section was financed by the European Bank for reconstruction and Development (EBRD). The southern stretch of the 23km bypass was completed in 2011. Now it is complete, the bypass will carry heavy port traffic away from Constanta. It will also provide a free-flowing route for tourist traffic from Romanian capital Bucharest and the north of
  • Loan to finance Nicaragua capital road project
    April 20, 2017
    A loan from the European Investment Bank (EIB) will fund work on a highway project in Nicaragua’s capital Managua. The US$136 million financing package was secured by the Nicaraguan Government. This will be used to improve and widen the Pista Juan Pablo II highway, boosting capacity and reducing congestion at peak periods, as well as improving safety for drivers. The work involves widening the route so that it has three lanes in either direction, as well as building five flyovers, installing drainage, cycli
  • Delays to key links for major Algerian highway
    April 16, 2015
    Delays are afflicting construction of a new highway that will connect with Algeria’s key East-West highway. The problems focus on the new highway being built to join Béjaïa with the East-West highway. The US$1.02 billion highway project was originally planned for completion by June 2016. However a shortage of construction workers from the local area for the 5,000 or so required means that personnel will have to be recruited from further afield, whether Algeria or neighbouring countries. Delays are also bein