Skip to main content

Liverpool picks winners for €313 million of highway works

Colas and Tarmac are among the winning contractors being placed on a €313 million framework deal for highways planned maintenance in Liverpool, England. The four-year framework is divided into three lots and is available to local governments in the greater Liverpool City area in northwest England. Suppliers for Lot 1 (works under €559,000) are Huyton Asphalt, Dyer and Butler, King Construction, Dowhigh, Aggregate Industries and Colas. Lot 2 suppliers (works from €279,000 to €6.7 million) are Huyton
September 13, 2019 Read time: 2 mins
Framed in Liverpool: Colas and Tarmac are among contractors which will tackle potholes and other planned maintenance over four years

184 Colas and 2399 Tarmac are among the winning contractors being placed on a €313 million framework deal for highways planned maintenance in Liverpool, England.

The four-year framework is divided into three lots and is available to local governments in the greater Liverpool City area in northwest England.

Suppliers for Lot 1 (works under €559,000) are Huyton Asphalt, 6084 Dyer and Butler, King Construction, Dowhigh, 2297 Aggregate Industries and Colas.

Lot 2 suppliers (works from €279,000 to €6.7 million) are Huyton Asphalt, NMCN, Colas, Tarmac, John Graham, King Construction and Dowhigh.

Suppliers for Lot 3 (from €5.6-13.5 million) are Huyton Asphalt, NMCN, Colas, King Construction, Dowhigh and John Graham.

“We are the only national contractor to be selected for all three lots,” said Carl Fergusson, chief executive of Colas UK, part of the French global Colas Group. “Colas was awarded the framework placement through recognition of a clear intention to promote local employment, through the self-delivery of works and active promotion and mentoring of local small-to-medium-size contractors.”

Liverpool put the framework out to tender eight months after ending a contract with Amey and bringing service back in-house in order to make savings, according to reports by local media late last year. The Amey contract began in 2013 and was due to run until 2022.

The council announced that the insourcing was in order to save around €100 million over three years in the face of other government cuts. It estimated it would save nearly €840,000 which will be used for pothole repairs and installation of alleygates – lockable gates across alleys running between the rear gardens of houses in dense residential areas.

For more information on companies in this article

Related Content

  • Island Roads is on the march along the UK’s Isle of Wight
    November 21, 2018
    Ringway Island Roads recently completed a major 12km upgrade to one of the UK’s most iconic roads. The upgrade to the Military Road, on the Isle of Wight in the English channel, is the largest carriageway improvement project delivered in a single scheme by Ringways’ Island Roads division. The project was part of the Isle of Wight’s Highway Improvement Programme which is financed in the main through a grant of €535 million awarded by the UK’s Department for Transport. The section between the villages
  • Significant wins for Signify
    April 19, 2021
    Signify is transforming Gran Canaria’s most important highway, known as GC-1, into a smart highway with the company’s Interact City system
  • UK’s Annual Local Authority Road Maintenance – ALARM – survey
    June 16, 2017
    Within years, one in six UK local roads will need repairs or face closure, according to the latest Annual Local Authority Road Maintenance – ALARM – survey. The cumulative effect of an ageing network, decades of underfunding, increased traffic and wetter winters has led to around 17% of all UK local roads reportedly in poor structural condition, with less than five years of life remaining. The 22nd annual ALARM survey is a comprehensive study into local road maintenance funding and conditions. Local authori
  • Serbia, Turkey formalise cooperation for Belgrade-Sarajevo motorway
    October 20, 2017
    Serbia has cemented its cooperation deal with Turkey for construction of the Belgrade-Sarajevo motorway at an estimated cost of around €830 million. The 60km motorway will be an extension of the Corridor 11 project and start where the 31km long Preljine-Pozega segment of Corridor 11 ends, Serbian media reported.