Skip to main content

Liverpool picks winners for €313 million of highway works

Colas and Tarmac are among the winning contractors being placed on a €313 million framework deal for highways planned maintenance in Liverpool, England. The four-year framework is divided into three lots and is available to local governments in the greater Liverpool City area in northwest England. Suppliers for Lot 1 (works under €559,000) are Huyton Asphalt, Dyer and Butler, King Construction, Dowhigh, Aggregate Industries and Colas. Lot 2 suppliers (works from €279,000 to €6.7 million) are Huyton
September 13, 2019 Read time: 2 mins
Framed in Liverpool: Colas and Tarmac are among contractors which will tackle potholes and other planned maintenance over four years

184 Colas and 2399 Tarmac are among the winning contractors being placed on a €313 million framework deal for highways planned maintenance in Liverpool, England.

The four-year framework is divided into three lots and is available to local governments in the greater Liverpool City area in northwest England.

Suppliers for Lot 1 (works under €559,000) are Huyton Asphalt, 6084 Dyer and Butler, King Construction, Dowhigh, 2297 Aggregate Industries and Colas.

Lot 2 suppliers (works from €279,000 to €6.7 million) are Huyton Asphalt, NMCN, Colas, Tarmac, John Graham, King Construction and Dowhigh.

Suppliers for Lot 3 (from €5.6-13.5 million) are Huyton Asphalt, NMCN, Colas, King Construction, Dowhigh and John Graham.

“We are the only national contractor to be selected for all three lots,” said Carl Fergusson, chief executive of Colas UK, part of the French global Colas Group. “Colas was awarded the framework placement through recognition of a clear intention to promote local employment, through the self-delivery of works and active promotion and mentoring of local small-to-medium-size contractors.”

Liverpool put the framework out to tender eight months after ending a contract with Amey and bringing service back in-house in order to make savings, according to reports by local media late last year. The Amey contract began in 2013 and was due to run until 2022.

The council announced that the insourcing was in order to save around €100 million over three years in the face of other government cuts. It estimated it would save nearly €840,000 which will be used for pothole repairs and installation of alleygates – lockable gates across alleys running between the rear gardens of houses in dense residential areas.

For more information on companies in this article

Related Content

  • 2018 finish for Lithuania’s E 67 Via Baltica Kaunas-Marijampole stretch
    August 23, 2018
    Widening a Lithuanian stretch of the Via Baltica from Kaunas to Marijampole to four lanes should be completed this year, the government said. Transport Minister Rokas Masiulis also said that the highway – also known as the pan-European E 67 - from Marijampole to the Polish border would be reconstructed by 2022. He said safety issues – 42 fatalities in the past 10 years - prompted the widening at a cost of nearly €90 million.
  • Intrakat lands on its feet with the Ammann’s ABT QuickBatch plant
    December 13, 2018
    Greek construction company Intrakat likes a challenge. It recently took on two closely scheduled airport projects – but it had only a single asphalt plant. Intrakat used the transport-optimised Ammann ABT QuickBatch Asphalt-Mixing Plant to produce mix at the airport on the island of Mykonos airport. Afterwards, the plant was packed and ferried to Kos. The upgraded runways at Mykonos and Kos are two of the 14 Greek airports being rehabilitated within seven months. Intrakat is handling mix production at
  • Zipping up road lanes – with Barrier Systems
    September 10, 2018
    QMB has a Lindsay Road Zipper on duty near Montreal. World Highways deputy editor David Arminas climbed aboard As vice president of Canadian barrier specialist QMB, based in Laval, Quebec, Marc-Andre Seguin is sanguine about the future for moveable barriers. On the one hand, it looks good. The oft-stated advantage of moveable barriers is that the systems are cheaper to install than adding a lane or two to a highway or bridge. Directional changes to lanes can boost volume on a road without disrupting tra
  • Bauer records high group revenue growth for Q3 at 22%
    November 15, 2017
    Bauer, equipment maker for ground investigation work, reports third quarter 2017 total group revenue up 22% on the previous year to just over €1,398 million. The German company said sales revenues increased by 27.5% to €1,265.6 million. However, the order backlog was €977.3 million that, while still high, was down from €1,019.0 million the previous year. This was due to a high double-digit million order backlog taken off the books after the sale of shares in a real estate company at the end of 2016.