Skip to main content

Liebherr open new sales and service centre in Miami, Florida

More than 300 invited customers and guests attended the grand opening of Liebherr’s new sales and service centre in Miami, Florida. The new state-of-the-art facility will serve as a major hub for Liebherr’s maritime cranes division and will further strengthen business relations with Central and South America and the Caribbean region. In terms of logistics, the sales and service centre is said to be ideally located: the port of Miami and Miami International Airport are in close proximity to the new
September 25, 2013 Read time: 2 mins
More than 300 invited customers and guests attended the grand opening of 718 Liebherr’s new sales and service centre in Miami, Florida.

The new state-of-the-art facility will serve as a major hub for Liebherr’s maritime cranes division and will further strengthen business relations with Central and South America and the Caribbean region.  

In terms of logistics, the sales and service centre is said to be ideally located: the port of Miami and Miami International Airport are in close proximity to the new site. This allows Liebherr to respond to customer enquiries within a short time and to accelerate the distribution of parts and services.  

A variety of Liebherr machines, including a crawler crane, a piling and drilling rig, reachstackers and mobile cranes were present at the official centre opening. Liebherr also presented its newest technologies, including a model of the company’s new, eco-friendly hybrid drive, named Pactronic.

The newly built complex is situated on a total property area covering 40,000m². In 2013 about 52 staff members will be working in this new facility.

The sales and service centre accommodates a fully furnished workshop with a 9tonne overhead crane, two fully equipped 6m welding containers, one 6m wire rope reeling container and two fully equipped mobile harbour cranes commissioning containers. Special tools and equipment for after sales service can also be found. For serving greater Miami, the Fort Lauderdale area and the surrounding ports, service personnel have six service trucks at their disposal.

“The new facility perfectly meets the requirements to further improve our sales and service performance in both North and Latin America,” said Gernot Schranz, president of Liebherr Nenzing Crane Co.

For more information on companies in this article

Related Content

  • Heavy going for heavy loads in Canada’s Alberta province
    January 9, 2019
    Canada’s Alberta province is considering a US$1.2 billion upgrade to its High Load Corridor that recently saw transportation of an 820 tonne petrochemical pipe. The 96m long tower – equivalent to a football pitch in length and about two lanes wide - was made in the capital city Edmonton, loaded onto a special trucking unit and driven the 38km to Fort Saskatchewan, mostly along provincial Highway 14 and then 21. The journey took four days and the tower, a polypropylene-propane splitter - will be instal
  • Volvo CE is investing in its research and development
    May 20, 2014
    Volvo Construction Equipment has started work on its new test and development centre in Hapcheon, Korea. The facility lies close to the company’s existing excavator manufacturing facility in Changwon. The new facility doubles as Volvo CE’s excavator testing capacity in Korea and includes an all-weather test dome, reliability and noise test field, workshops, various complete machine performance test areas and a customer clinic. Engineers at the 253,515m2 site will focus on excavator product development, adva
  • Key Florida highway link wins major award
    July 2, 2014
    A major highway connection project located in Tampa, Florida has won a 2014 Outstanding Project Award from the Florida Department of Transportation (FDOT) and the Florida Institute of Consulting Engineers (FICE). The link was opened in January 2014 and was engineered by designer Atkins. The 1.6km-long I-4/Selmon Connector links I-4 with the Lee Roy Selmon Expressway. The US$425 million Connector now carries over 24,000 vehicles/day, which includes some 2,000 heavy vehicles/day. With the construction of the
  • Develon’s new German facility
    January 24, 2025
    Develon has taken charge of its new German facility