Skip to main content

Legal challenge to Austria-Slovenia tunnel contract award

A legal challenge has now been launched against the tender award for the second tube for the Karawanks/Karavanke Tunnel project between Austria and Slovenia. The challenge has been launched by the two bidders that were unsuccessful for the project, Kolektor CPG and Euro-Asfalt. The 7.8km-long tunnel route runs under the Alpine Karawanks/Karavanke mountain range, connecting the Austrian Autobahn A11 from Villach with the A2 highway, running across the border to the Slovenian cities of Kranj and Ljubljana.
August 23, 2018 Read time: 1 min

A legal challenge has now been launched against the tender award for the second tube for the Karawanks/Karavanke Tunnel project between Austria and Slovenia. The challenge has been launched by the two bidders that were unsuccessful for the project, Kolektor CPG and Euro-Asfalt. The 7.8km-long tunnel route runs under the Alpine Karawanks/Karavanke mountain range, connecting the Austrian Autobahn A11 from Villach with the A2 highway, running across the border to the Slovenian cities of Kranj and Ljubljana.

Related Content

  • Italy's strategic tunnel link
    August 21, 2012
    The world's largest tunnelling machine is completing Italy's important road connection between Bologna and Florence - Adrian Greeman reports For just under a decade a huge programme of highway construction has been underway in the mountainous region between Bologna and Florence, realigning a section of the A1 highway nearly 70km long. The new section, through major tunnels and across high viaducts, will greatly increase capacity on Italy's most important highway.
  • Chile-Argentina tunnel project moving ahead
    June 26, 2014
    So far 18 companies have been registered as eligible for tenders in the Agua Negra Tunnel project, which will link Argentina with Chile. The tender process is commencing for the project in the second half of 2014. The new tunnel will provide a better alternative to existing routes connecting the two countries through the Andes Mountain range at present. One of the existing routes is through a high mountain pass, which is frequently blocked due to poor weather while being unsuitable for heavy vehicles. The o
  • Chile-Argentina tunnel project moving ahead
    June 26, 2014
    So far 18 companies have been registered as eligible for tenders in the Agua Negra Tunnel project, which will link Argentina with Chile. The tender process is commencing for the project in the second half of 2014. The new tunnel will provide a better alternative to existing routes connecting the two countries through the Andes Mountain range at present. One of the existing routes is through a high mountain pass, which is frequently blocked due to poor weather while being unsuitable for heavy vehicles. The o
  • Caterpillar meets the challenges
    February 14, 2012
    Roads in south-eastern France and those on the west coast of Spain share a common challenge often faced by road construction crews around Europe: extremely tight working conditions. According to Caterpillar, such conditions create construction demands that can affect traffic flow, the preservation of historic structures and even the ability to resurface these narrow roads that, in some cases, have been around for centuries. Add to these challenging working conditions, the mountainous terrain found in the Al