Skip to main content

Legal challenge to Austria-Slovenia tunnel contract award

A legal challenge has now been launched against the tender award for the second tube for the Karawanks/Karavanke Tunnel project between Austria and Slovenia. The challenge has been launched by the two bidders that were unsuccessful for the project, Kolektor CPG and Euro-Asfalt. The 7.8km-long tunnel route runs under the Alpine Karawanks/Karavanke mountain range, connecting the Austrian Autobahn A11 from Villach with the A2 highway, running across the border to the Slovenian cities of Kranj and Ljubljana.
August 23, 2018 Read time: 1 min

A legal challenge has now been launched against the tender award for the second tube for the Karawanks/Karavanke Tunnel project between Austria and Slovenia. The challenge has been launched by the two bidders that were unsuccessful for the project, Kolektor CPG and Euro-Asfalt. The 7.8km-long tunnel route runs under the Alpine Karawanks/Karavanke mountain range, connecting the Austrian Autobahn A11 from Villach with the A2 highway, running across the border to the Slovenian cities of Kranj and Ljubljana.

Related Content

  • Nigeria-Ivory Coast route feasibility study
    May 12, 2017
    The tender process is now being opened for the feasibility study into the planned highway project to link Nigeria’s commercial centre Lagos with Abidjan, the commercial centre for Ivory Coast.
  • Australia tunnel contract awarded to consortium
    December 19, 2018
    In Australia a contract worth US$2.75 billion (A$3.9 billion) has been awarded to a consortium made up of John Holland and CPB Contractors. The design build deal includes constructing an interchange as well as a 1km stretch of tunnel that will connect with the Iron Cove Bridge. The contract is due for completion by 2023 and forms part of the WestConnex toll road project. Building the Rozelle interchange will be complex as the work will include construction three levels of tunnels as well as a connection to
  • Brodno-Kysucke Nove Mesto bypass progresses
    September 22, 2022
    Metrostav was chosen to build the D3 Zilina-Kysucké Nové Mesto feeder in Brodno town.
  • Strabag wins €83.3mn Bosnia motorway contract
    September 17, 2013
    Strabag has won an €83.3 million contract to build a 10.4km section of the Corridor 5c motorway in Bosnia. The major contract for the Svilaj-Odžak section of the international motorway corridor includes the construction of highway, the border crossing at Svilaj, the Svilaj toll station, two service areas and two motorway exits.