Skip to main content

Land costs push up the price tag of the Dhaka-Chittagong Expressway

Ballooning land acquisition costs are pushing up the cost of the proposed 217km Dhaka-Chittagong Expressway, according to media reports. Under the project, the highways directorate has already widened 190km of the two-lane highway to four-lanes and constructed three flyovers. The sources also said now the agency has estimated the cost for constructing the full 217km at nearly US$2.4 billion without land acquisition cost.
August 23, 2018 Read time: 2 mins
Ballooning land acquisition costs are pushing up the cost of the proposed 217km Dhaka-Chittagong Expressway, according to media reports.


Under the project, the highways directorate has already widened 190km of the two-lane highway to four-lanes and constructed three flyovers.

The sources also said now the agency has estimated the cost for constructing the full 217km at nearly US$2.4 billion without land acquisition cost.

They said the nine times higher cost has been estimated for the expressway project on the same highway mainly to acquire land for it.

Project office sources said an additional $1.62 billion will be required for the public-private partnership project to acquire 775 hectares of land and shift utilities shifting work, which was not required for the four-lane widening project. Most of the land across the entire corridor of the four-lane project was acquired in 1960s, the Financial Express said.

Meanwhile, badly planned and positioned flyovers are being blamed for holding up construction of Dhaka’s planned 22km bus rapid transit system. Only around 10km of the six-lane project – two central lanes exclusively for buses – are likely to be built and not until 2024, transport officials are reported to have said.

The 22km route starts at the airport and will end in the port area of Keraniganj. The trip takes about three hours by car but would take around half an hour by bus rapid transit.

Related Content

  • Progress for new highway project in Colombia
    June 5, 2014
    In Colombia the firm Estructura Plural Mario Alberto Huertas-Constructora MECO has been awarded the Girardot-Puerto Salgar 4G highway concession. The US$674 million concession was awarded following a short delay due to legal complexities by Colombia's national infrastructure agency ANI, reports Business News Americas. The 214km Girardot-Puerto Salgar highway is in central Colombia and the concession package includes the construction of 190km of the route, of which 22km will be totally new. A 135km stretch w
  • Kazakhstan’s London road show woos consortia for Almaty ring road
    March 2, 2015
    Kazak and EBRD officials visited London to highlight the possibility of a public-private partnership under the country’s revised PPP legal framework. David Arminas reports. To build a road, you go on the road, and that is what Kazakhstan did in London in mid-December. Representatives of more than 100 organisations, a mix of construction companies and financial institutions, attended the roadshow-style presentation to attract foreign capital for BAKAD, the Almaty Ring Road Concession. The message was that Ka
  • ACE/AECOM report: private sector and user-pay for English roads
    May 14, 2018
    It’s one minute to midnight for funding England’s roads, according to a timely new report, and the clock’s big hand is pointing to some form of user-pay solution, reports David Arminas Is there any way out of future user-pay funding for England’s highway infrastructure? The answer is a resounding ‘no’, according to the recently published report: Funding Roads for the Future. The brief 25-page document by the London-based Association for Consultancy and Engineering, ACE**, sums up the state of England’s ro
  • Highway 407 Revisited – smart tollroad extension
    June 7, 2016
    In the late 1990s, World Highways published a supplement on construction of Canada’s Highway 407, the world’s first all-electronic toll road. But how successful has it been? David Arminas reports from Toronto The head office for 407 ETR Concession Company is a low-rise building next to exit 59, just north of Toronto, Canada’s economic powerhouse. The building may be non-descript but inside is the advanced technical heart of Highway 407 ETR – Express Toll Route. It houses the latest toll monitoring techno