Skip to main content

Koridori Srbije said it is suffering delays to Corridor 10 work

Koridori Srbije, the contractor building the eastern section of the Corridor 10 motorway between Nis and the Bulgarian border, said completion will be delayed. The newspaper Vecernje Novosti reported that Koridori Srbije said works on the Prosek-Bancarevo section, Crvena Reka-Ciflik, Pirot East-Dimitrovgrad and the Bancarevo tunnel should be finished by the end of the year. Construction on the Dimitrovgrad ringroad are due to be completed in March.
October 18, 2016 Read time: 1 min
3235 Koridori Srbije, the contractor building the eastern section of the Corridor 10 motorway between Nis and the Bulgarian border, said completion will be delayed.

The newspaper Vecernje Novosti reported that Koridori Srbije said works on the Prosek-Bancarevo section, Crvena Reka-Ciflik, Pirot East-Dimitrovgrad and the Bancarevo tunnel should be finished by the end of the year.

Construction on the Dimitrovgrad ringroad are due to be completed in March.

For more information on companies in this article

Related Content

  • China's Exim Bank to approve US$ 1.1bn to build Serbia’s Corridor 11 motorway
    October 2, 2012
    The Serbian government has reported that it is planning to sign a loan agreement with China's Exim Bank for new loans worth US$ 1.1 billion for construction of the Corridor 11 motorway. Minister of Finance, Mladan Dinkic, said that the loan will be used for construction of the Belgrade-Ljig and Pojate Preljina motorway parts. The contract agreement is due to be signed by the end of 2012 or beginning of 2013. Works are expected to start sometime next year.
  • Possible delays for Gordie Howe Bridge
    November 15, 2022
    The tolled six-lane cable-stayed bridge over the Detroit River will connect the city of Windsor in the Canadian province of Ontario with Detroit in the neighbouring US state of Michigan.
  • Serbia, Turkey formalise cooperation for Belgrade-Sarajevo motorway
    October 20, 2017
    Serbia has cemented its cooperation deal with Turkey for construction of the Belgrade-Sarajevo motorway at an estimated cost of around €830 million. The 60km motorway will be an extension of the Corridor 11 project and start where the 31km long Preljine-Pozega segment of Corridor 11 ends, Serbian media reported.
  • Chile highway construction works planned
    May 12, 2017
    The Chilean Government is planning a series of major highway projects with the Ministry of Public Works (MOP) managing the works. The plans call for 14 concessions worth a total of US$3.74 billion to be awarded by January 2018. The second stage of Americo Vespucio Oriente highway (AVO 2) is costing $800 million and is a priority project. This has been delayed already and opening of the route is now expected for 2022. Five regional highways are also opening for tender, including the Ruta G-21 road link, whic