Skip to main content

Koridori Srbije said it is suffering delays to Corridor 10 work

Koridori Srbije, the contractor building the eastern section of the Corridor 10 motorway between Nis and the Bulgarian border, said completion will be delayed. The newspaper Vecernje Novosti reported that Koridori Srbije said works on the Prosek-Bancarevo section, Crvena Reka-Ciflik, Pirot East-Dimitrovgrad and the Bancarevo tunnel should be finished by the end of the year. Construction on the Dimitrovgrad ringroad are due to be completed in March.
October 18, 2016 Read time: 1 min
3235 Koridori Srbije, the contractor building the eastern section of the Corridor 10 motorway between Nis and the Bulgarian border, said completion will be delayed.

The newspaper Vecernje Novosti reported that Koridori Srbije said works on the Prosek-Bancarevo section, Crvena Reka-Ciflik, Pirot East-Dimitrovgrad and the Bancarevo tunnel should be finished by the end of the year.

Construction on the Dimitrovgrad ringroad are due to be completed in March.

For more information on companies in this article

Related Content

  • Zimbabwe highway project linking with its neighbours
    November 28, 2016
    Zimbabwe’s Beitbridge to Chirundu highway link now looks set for a complete upgrade. The project has been planned for over 10 years but has faced a series of setbacks and delays, with funding having proved one of the biggest stumbling blocks in the past. The 897km highway runs from Beitbridge, located on the border with South Africa in the south of Zimbabwe all the way up to Chirundu, which is just over the border with Zambia in the north. The route includes part of the A4 highway in the south and the A1 hi
  • Serbian highway plans nearing completion
    October 26, 2020
    Serbian highway plans are nearing completion.
  • Danish-German Fehmarn Belt road and rail tunnel hits funding snag
    July 9, 2015
    A Danish newspaper has learned of a significant European Union funding gap for one of Europe’s most ambitious transportation road and rail projects. The Fehmarn Belt Fixed Link would connect the German island of Fehmarn with the Danish island of Lolland. A submersed tunnel will cross the 18km-wide Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea. Last February news emerged that contractors had revamped their cost estimates, adding nearly €1.2 billion to the project. This put the final cost of the 18
  • Costa Rica to replace Conavi with a National Infrastructure Institute
    March 14, 2016
    Amid concerns over the efficiency of Costa Rica’s highways agency Conavi, the authority has been given more time to provide details on expansion of Route 32, according to the La Republica newspaper. Conavi has been at loggerheads with the Treasury Inspector's Office which wants Conavi to move faster and authorise a contract for the expansion of road between Rio Frio and Limon granted to China Harbour Engineering Company. China Harbour has been requesting further details about the US$395 million projec