Skip to main content

Korean connections construction contracts considered?

After decades with no proper transport connections South Korea and North Korea will soon have new road and rail links. The South Korean Ministry of Land, Infrastructure and Transport is drawing up plans to rebuild the cross border, transport connections between the two countries. Work looks set to commence in 2018 on rebuilding a 12km highway section, as well as a 105km stretch of rail. Officials from both countries will carry out inspections jointly on the transport links so as to determine the extent of t
July 25, 2018 Read time: 1 min

After decades with no proper transport connections South Korea and North Korea will soon have new road and rail links. The South Korean Ministry of Land, Infrastructure and Transport is drawing up plans to rebuild the cross border, transport connections between the two countries. Work looks set to commence in 2018 on rebuilding a 12km highway section, as well as a 105km stretch of rail. Officials from both countries will carry out inspections jointly on the transport links so as to determine the extent of the work required.

Related Content

  • Two major Indian highway links under construction
    July 21, 2022
    Two major Indian highway links are under construction.
  • £24 billion spending on UK roads
    June 17, 2025
    The UK Government plans to invest £24 billion on roads.
  • Major road deals for France
    May 3, 2012
    The tender process for the A355 western Strasbourg bypass in France is nearing completion and the winner will be announced shortly. The 24km highway stretch is expected to take 52 months to build and will cost some €750 million while for the moment at least, Vinci Concessions is the preferred bidder. The 55 year contract includes design, financing, construction and operation and maintenance.
  • Major road deals for France
    March 20, 2012
    The tender process for the A355 western Strasbourg bypass in France is nearing completion and the winner will be announced shortly. The 24km highway stretch is expected to take 52 months to build and will cost some €750 million while for the moment at least, Vinci Concessions is the preferred bidder. The 55 year contract includes design, financing, construction and operation and maintenance.