Skip to main content

Key Kenya road project stalled

A key Kenya road construction project has stalled.
By MJ Woof December 4, 2023 Read time: 1 min
Work has stalled on an important road project in Kenya over payment issues – image courtesy of © Diana Opryshko|Dreamstime.com

Construction work has stalled in Kenya on the important Kenol-Sagana-Marua Road project. The Chinese firm Jiangxi Transportation Engineering Group has stopped its work due to delays with payments.

The project was originally due to be completed in late 2024 but this was then brought forward to the end of 2022, before a number of delays set in. The project involves widening an 84km road stretch so that it features a dual carriageway configuration with two lanes in either direction rather than a single lane in either direction.

A portion of the financing for the project is being provided via the African Development Bank (AfDB). The project is being managed by the Kenya National Highways Authority. Work started on the project in the third quarter of 2020 and the route forms part of the transport corridor linking Kenya’s capital, Nairobi, and its premier port, Mombasa, with Addis Ababa, capital of neighbouring Ethiopia. 

For more information on companies in this article

Related Content

  • Mongolia road project underway
    November 9, 2022
    A key Mongolian road project is now underway.
  • Kenya highway projects starting
    March 11, 2019
    Construction work is starting on two important road projects in Kenya. These are for the Dongo Kundu Southern Bypass and for the Mau Highway. The Mau highway project is worth US$2 billion and forms part of the route that links Kenya’s key port at Mombasa through its capital Nairobi to the border with neighbouring Uganda. The 180km Nairobi-Nakuru-Mau section of the A104 route will feature two lanes in either direction. The deal is being handled under a package that includes design, financing, maintenance a
  • Kenya-Tanzania road connection – work restarted
    February 19, 2019
    Construction work has been restarted on the 178km Isebania to Ahero road, connecting Kenya with Tanzania.
  • Kenya rehabilitates, widens, tolls Northern Corridor
    November 8, 2017
    A massive highway project in Kenya will boost transport for the country as well as its neighbours - Shem Oirere reports. Kenya has commenced the process of rehabilitating, expanding and tolling of 657km of East Africa’s Northern Corridor that is anchored on the Indian Ocean port of Mombasa and which links the gateway with landlocked countries of Uganda, Rwanda, Burundi and parts of eastern Democratic Republic of Congo (DRC).