Skip to main content

Kerch Strait Bridge project budget

A new budget projection has been set for Russia’s landmark Kerch Strait Bridge project. A close analysis of the various cost factors has now set the project’s pricetag at US$3.57 billion. Originally the project was expected to cost in the region of $1.5-3 billion but the challenging conditions and the tough winter climate have led to increased costs. The bridge will be 4.5km long and link Russia’s Taman Peninsula with the Crimean Peninsula.
July 13, 2016 Read time: 2 mins
A new budget projection has been set for Russia’s landmark Kerch Strait Bridge project. A close analysis of the various cost factors has now set the project’s pricetag at US$3.57 billion. Originally the project was expected to cost in the region of $1.5-3 billion but the challenging conditions and the tough winter climate have led to increased costs. The bridge will be 4.5km long and link Russia’s Taman Peninsula with the Crimean Peninsula. This new bridge will provide both road and rail links between the city of Krasnodar in Russia, and Sevastopol on the Crimean Peninsula. The design features four lanes for vehicle traffic and twin rail lines and the bridge is being constructed by the SGM Group. It is not the first bridge to span the Kerch Strait however. A temporary bridge structure was constructed in the 1940s but this last for only six months until it was wrecked by winter ice. Work on the new bridge commenced in May 2015 and is expected to last until late 2018.

Related Content

  • Russia planning Kerch Straits bridge project
    September 8, 2014
    The Russian authorities are further developing plans for the new bridge that will span the Kerch Strait. The bridge is now expected to cost some US$6.1 billion to construct and the completion date is expected in 2018. The work will be overseen by the Russian road authority Avtodor. This will be the first bridge crossing of the Kerch Strait since a short-lived structure was erected in the 1940s. The design will have to cope with severe winter weather and the project will be challenging technically.
  • More Russian firms sanctioned over Kerch Strait Bridge work
    August 6, 2018
    The European Union has sanctioned more Russian companies involved in the construction of the Kerch Strait Bridge linking Russia with the Crimean Peninsula. Newly placed on the list – now 44 companies in all – are the three firms PJSC Mostotrest, SGM and Stroygazmontazh Most OOO controlled by billionaire Arkady Rotenberg, a close friend of Russian president Vladimir Putin. Others are construction firm CJSC VAD, engineering firm GPSM and the Zaliv Shipyard. Russia seized the Crimea region from the Ukrai
  • Cost of bridge across Kerch Strait between Russia and Crimea doubles
    April 8, 2014
    The cost of building a bridge across the Kerch Strait between the Kerch Peninsula of Crimea and the Taman Peninsula of Russia's Krasnodar Krai may be double the initial forecast, according to Transport Minister Maxim Sokolov.
  • Russia’s key bridge link for Kerch Strait
    February 27, 2018
    Russia’s Ministry of Economic Development has said that the Kerch Bridge now looks likely to open to traffic in December 2018. In addition to the bridge, the highway connections should also be complete within the same timeline. The Kerch Strait bridge crossing is of key importance to the area and will help reduce journey times for drivers, as well as reducing transport costs considerably. Construction has not been without its challenges due in part to the fierce winter conditions. This is not the first