Skip to main content

Kenya highway project financing resolution

Construction work on Kenya’s vital Mombasa-Nairobi highway upgrade project is now going ahead as planned. A resolution has been achieved that will solve the funding issues that had threatened to delay the project. The project will cost nearly US$3 billion in all and is crucial for the country’s economic development as it will provide a new four lane highway connecting Kenya’s capital, Nairobi, with its largest port at Mombasa. But there were concerns that the funding method based on a series of loans that w
May 17, 2018 Read time: 2 mins
Construction work on Kenya’s vital Mombasa-Nairobi highway upgrade project is now going ahead as planned. A resolution has been achieved that will solve the funding issues that had threatened to delay the project. The project will cost nearly US$3 billion in all and is crucial for the country’s economic development as it will provide a new four lane highway connecting Kenya’s capital, Nairobi, with its largest port at Mombasa. But there were concerns that the funding method based on a series of loans that was originally proposed would result in Kenya facing large debts. Instead the project is now being carried out under a full PPP model, with US contractor 4138 Bechtel operating the route and collecting tolls.

The highway is of importance not only for Kenya, but for East Africa as a whole. It forms part of a wider plan to improve transport across East Africa and will provide an important route to and from Mombasa for landlocked countries such as neighbouring Uganda.

For more information on companies in this article

Related Content

  • Huge potential of Kenya’s bitumen market
    May 17, 2017
    Kenya’s bitumen demand to grow - Shem Oirere writes. Kenya’s demand for bitumen products is set to increase with recent budget allocations for construction of new roads, ports and airports and for maintenance of existing transport infrastructure. The country’s economic growth rose from 5.3% in 2014 to 5.5% in 2015 and is projected to hit 6% and 6.4% in 2016 and 2017 respectively according to the African Development Bank, triggering demand for better and modern infrastructure particularly in the transport se
  • New Sudan link will boost economic development
    February 21, 2013
    South Sudan’s new showpiece road has reduced travelling times and improved access to markets and basic services. Shem Oirere reports Bituminous surface treatment is common for highways with low-traffic or for the rejuvenation of a weakening asphalt concrete pavement. But this is what the 192km Juba-Nimule Highway in the world’s youngest nation, South Sudan, needed in its reconstruction to bring it to international standards. Commissioning of the highway effectively erases the tag ‘landlocked’ from South Su
  • East End Crossing Project—Availability payment P3 in action
    July 14, 2017
    Indiana exercised its authority to use a P3 contract when it partnered with Kentucky for new bridges across the Ohio River. Barney Allison and John Smolen* explain the groundbreaking availability payment deal. Earlier this year, traffic began rolling over the new tolled Lewis and Clark Bridge spanning the Ohio River from northern Kentucky to southern Indiana. The cable-stayed bridge is part of the award-winning Ohio Bridges Project to untangle traffic within the greater metropolitan area of Louisville, Kent
  • Kenya key bridge project
    April 22, 2021
    Kenya’s key bridge project is going ahead.