Skip to main content

Kazakhstan sets road repair budget

Kazakhstan has set a budget for road repairs of nearly US$167 million in a bid to ensure that its network remains in good condition. The country has set a target to repair and maintain around 5,000km of local roads/year. In 2017 around 2,000km of roads of national importance were repaired, while 1,800km of roads of national importance will be repaired in 2018. In all, 4,200km of roads will be repaired in Kazakhstan in 2018, according to the country's Ministry of Investment and Development.
September 4, 2018 Read time: 1 min

Kazakhstan has set a budget for road repairs of nearly US$167 million in a bid to ensure that its network remains in good condition. The country has set a target to repair and maintain around 5,000km of local roads/year. In 2017 around 2,000km of roads of national importance were repaired, while 1,800km of roads of national importance will be repaired in 2018. In all, 4,200km of roads will be repaired in Kazakhstan in 2018, according to the country's Ministry of Investment and Development.

Related Content

  • IRF World Meeting: Strong business opportunities in a growing region
    September 26, 2013
    The 17th IRF World Meeting & Exhibition offers a chance for the industry to see what is going on in the field of infrastructure, not only in Riyadh but also in the whole of Saudi Arabia and the wider Gulf region. According to IRF chairman and mayor of Riyadh Eng Abdullah A Al-Mogbel, “Ongoing infrastructure programs concern not only roads and railways, but a whole swath of civil engineering projects — I am convinced many more companies that are not currently operating in the Kingdom should take this opportu
  • Hydrodemolition equipment helps Swiss bridge rebuild
    December 2, 2014
    A highway bridge in Switzerland has been refurbished with help from hydrodemolition equipment supplied by Aquajet The firm’s latest Rotolance 2500 was used alongside an Aquacutter 710 VE evolution on the Viaduc de Chillon link, above Lake Geneva. The machines were used by Zurich-based hydrodemolition specialist contractor, Walo Hydrodynamik, to remove more than 25,000m³ of concrete deck on the bridge.
  • Brazil’s road development programme continues
    June 7, 2016
    Brazil is continuing to work on its road development programme, despite budgetary restraints due to the country’s difficult economic climate. Responsibility for over 10,000km of road that have had minimal maintenance or improvement works over the previous 15 years will now be taken by the Federal Government. An overall lack of funding has combined with disagreements between federal and state authorities as to who should pay for road upgrades, resulting in no work being carried out at all. Meanwhile improv
  • ARTBA sees growth for US transport construction
    December 5, 2017
    Steady growth in the US market for transport infrastructure construction in 2018. This prediction comes from a new report by the American Road & Transportation Builders Association (ARTBA). The report suggests that the US transportation infrastructure market will rebound slightly next year, following a 2.8% drop in 2017.