Skip to main content

Jobs lost at ailing Cleveland Bridge

The steel fabricator in Darlington, England, is now up for sale.
By David Arminas August 6, 2021 Read time: 2 mins
Cleveland Bridge has worked on some of the world’s most iconic bridges, including Scotland’s Queensferry Crossing which opened in 2017 (image courtesy Cleveland Bridge)

More than 50 staff have lost their jobs at Cleveland Bridge as administrators look to find a buyer for the ailing UK bridge contractor.

The redundancies are at the company’s steel fabrication plant in Darlington, northern England, according to reports by local media.

Consultancy FRP, which was appointed last month to handle the administration, said discussions continue with “interested parties”. A small group of around 25 core staff remain at work to help the administrators restart production as soon as possible.

Meanwhile, some staff have left voluntarily and Chris Droogan, the managing director, has officially left the company after six years in the job. Most of the jobs that have gone are office-based and not production related.

The local Northern Echo newspaper reported that potential new owners will already have back office capacity but will be keen to keep highly-skilled production staff. There are believed to be three or four possible bidders but this have not been confirmed, the newspaper said.

Cleveland Bridge was founded in 1877 and is a world-leading steel fabricator and constructor of bridges and complex structures. It offers a full turnkey service from design to installation, including bridge refurbishment and rehabilitation. As part of the Al Rushaid Group, Cleveland Bridge produces high-quality structural steel components at advanced manufacturing centres in the UK, Dubai and Saudi Arabia.

The company has erected some of world’s most iconic bridges, including the Victoria Falls Bridge in Zimbabwe and the Sydney Harbour Bridge in Australia. In 2019, Cleveland Bridge undertook pre-planned phases of finishing work on Scotland’s majestic Queensferry Crossing, built alongside the existing Forth Road Bridge.

For more information on companies in this article

Related Content

  • Cairo’s massive new bridge
    May 22, 2019
    Egyptian capital Cairo is already benefiting from the opening of a massive new bridge. features six lanes in either direction, making it the world’s widest suspension bridge. This bridge is one of several forming part of the new highway running across Egyp
  • Peljesac Bridge access roads finished
    November 15, 2021
    The final access road tunnel for Croatia’s Peljesac Bridge is finished.
  • The UK’s Humber Bridge gets protected status
    July 28, 2017
    Any refurbishments to the Humber Bridge near the northern English city of Hull will be subject to intense scrutiny after being designated a historic site. The bridge - only 36-years old – was the longest single-span suspension bridge for 16 years until it was surpassed in 1998 with completion of Japan’s Akashi Kaikyō Bridge with a main span of 1.9km. The Humber Bridge now ranks eighth-longest as measured by its main span of 1.4km. Historic England, the listed structures designating authority, described the
  • Maybe Hire takes on Whorlton Bridge
    March 14, 2025
    For refurbishment of the old English bridge, a temporary cable crane structure - designed by CaSE Civil & Structural Engineering - used a range of Mabey Hire’s propping equipment, including the Mass 50, System 160 and Mat 125 products.