Skip to main content

Jobs lost at ailing Cleveland Bridge

The steel fabricator in Darlington, England, is now up for sale.
By David Arminas August 6, 2021 Read time: 2 mins
Cleveland Bridge has worked on some of the world’s most iconic bridges, including Scotland’s Queensferry Crossing which opened in 2017 (image courtesy Cleveland Bridge)

More than 50 staff have lost their jobs at Cleveland Bridge as administrators look to find a buyer for the ailing UK bridge contractor.

The redundancies are at the company’s steel fabrication plant in Darlington, northern England, according to reports by local media.

Consultancy FRP, which was appointed last month to handle the administration, said discussions continue with “interested parties”. A small group of around 25 core staff remain at work to help the administrators restart production as soon as possible.

Meanwhile, some staff have left voluntarily and Chris Droogan, the managing director, has officially left the company after six years in the job. Most of the jobs that have gone are office-based and not production related.

The local Northern Echo newspaper reported that potential new owners will already have back office capacity but will be keen to keep highly-skilled production staff. There are believed to be three or four possible bidders but this have not been confirmed, the newspaper said.

Cleveland Bridge was founded in 1877 and is a world-leading steel fabricator and constructor of bridges and complex structures. It offers a full turnkey service from design to installation, including bridge refurbishment and rehabilitation. As part of the Al Rushaid Group, Cleveland Bridge produces high-quality structural steel components at advanced manufacturing centres in the UK, Dubai and Saudi Arabia.

The company has erected some of world’s most iconic bridges, including the Victoria Falls Bridge in Zimbabwe and the Sydney Harbour Bridge in Australia. In 2019, Cleveland Bridge undertook pre-planned phases of finishing work on Scotland’s majestic Queensferry Crossing, built alongside the existing Forth Road Bridge.

For more information on companies in this article

Related Content

  • Wacker Neuson rebar tiers at Queensferry
    February 7, 2017
    When the Queensferry Crossing over the Forth Estuary opens at the end of 2016, it will be the third landmark bridge to be built spanning this short stretch of water. This 2.7km structure is lying alongside the existing road bridge and the historic rail bridge and is the centrepiece of the upgrade to Scotland’s key cross-Forth transport corridor. Responsible for the construction is Forth Crossing Bridge Constructors – FCBC, a consortium of companies from Germany, Spain, the US and the UK. Construction
  • Changes possible for Lake Mjøsa Bridge
    September 28, 2022
    The proposed four-lane wooden bridge across Norway’s Lake Mjøsa would be the second such structure and part of the new E6 highway project.
  • Asphalt demand to grow in US road rebuilding
    July 13, 2017
    US demand for asphalt for use in paving roads and highways looks set to grow and will reach 13.7 million tonnes/year by 2021.
  • Højgaard and BESIX win Nordhavn Tunnel work
    September 16, 2022
    The €349.6 million Nordhavnstunnel contract in the capital Copenhagen was awarded by the Danish Road Directorate / Vejdirektoratet.