Skip to main content

Jobs lost at ailing Cleveland Bridge

The steel fabricator in Darlington, England, is now up for sale.
By David Arminas August 6, 2021 Read time: 2 mins
Cleveland Bridge has worked on some of the world’s most iconic bridges, including Scotland’s Queensferry Crossing which opened in 2017 (image courtesy Cleveland Bridge)

More than 50 staff have lost their jobs at Cleveland Bridge as administrators look to find a buyer for the ailing UK bridge contractor.

The redundancies are at the company’s steel fabrication plant in Darlington, northern England, according to reports by local media.

Consultancy FRP, which was appointed last month to handle the administration, said discussions continue with “interested parties”. A small group of around 25 core staff remain at work to help the administrators restart production as soon as possible.

Meanwhile, some staff have left voluntarily and Chris Droogan, the managing director, has officially left the company after six years in the job. Most of the jobs that have gone are office-based and not production related.

The local Northern Echo newspaper reported that potential new owners will already have back office capacity but will be keen to keep highly-skilled production staff. There are believed to be three or four possible bidders but this have not been confirmed, the newspaper said.

Cleveland Bridge was founded in 1877 and is a world-leading steel fabricator and constructor of bridges and complex structures. It offers a full turnkey service from design to installation, including bridge refurbishment and rehabilitation. As part of the Al Rushaid Group, Cleveland Bridge produces high-quality structural steel components at advanced manufacturing centres in the UK, Dubai and Saudi Arabia.

The company has erected some of world’s most iconic bridges, including the Victoria Falls Bridge in Zimbabwe and the Sydney Harbour Bridge in Australia. In 2019, Cleveland Bridge undertook pre-planned phases of finishing work on Scotland’s majestic Queensferry Crossing, built alongside the existing Forth Road Bridge.

For more information on companies in this article

Related Content

  • Germany’s Salierbrücke bridge reopens
    December 1, 2021
    Extensive upgrading of the Salier Bridge was commissioned by Karlsruhe city council in 2019.
  • The UK’s A14 route is seeing a major upgrade
    June 14, 2018
    Work is progressing well on the project to upgrade the busy A14 route in the UK. A major milestone has been achieved with and important phase of the bridge installation having taken place. A 39m viaduct beam has been placed successfully for the bridge, which spans the River Ouse in Cambridgeshire. A key role in this work has been taken by the firm Cleveland Bridge UK. As part of Highways England’s £1.5 billion A14 Cambridge to Huntingdon improvement scheme, Cleveland Bridge was contracted by the A14 Integr
  • Peerless performance for Aggregate Industries on Nene Bridge job
    June 4, 2019
    Aggregate Industries is supplying its Lytacrete secondary aggregate solution for the US$6.5 million Nene Bridge structural refurbishment project near Peterborough, England.
  • Mabey Hire supports the Whorlton Bridge
    June 10, 2025

    Whorlton Bridge in England’s County Durham has had to be closed to traffic while a major programme of works is carried out. Every component is to be removed, refurbished and replaced.

    To facilitate the works, a bespoke catenary system has been installed, with Mabey Hire’s adaptable and modular propping equipment used to construct the temporary structure.