Skip to main content

JCB is stopping production in the UK

JCB is stopping production in its UK factories.
By MJ Woof March 19, 2020 Read time: 1 min
JCB is halting production at its UK factories

JCB is stopping production at all of its UK manufacturing plants due to a massive slump in demand, resulting from the worldwide Coronavirus pandemic.

The firm says that it will halt production for the rest of this week and the whole of next week at its nine manufacturing plants in Staffordshire, Derbyshire and Wrexham.  No decision has yet been taken on what happens from the week commencing Monday, March 30th and beyond.

The firm’s manufacturing facility in China, located close to Shanghai, halted production last month as the impact of the pandemic initially took hold. After several weeks of disruption, the factory is now fully operational.

JCB CEO Graeme Macdonald said: “These measures are unprecedented in the history of JCB but are absolutely necessary to protect the business. As we continue to deal with the health implications of the COVID-19 pandemic, it has become more challenging to maintain business continuity in this volatile economic climate. JCB is a global exporter and worldwide demand for our products has dropped sharply as customers cancel orders and defer deliveries. This is not just a UK issue, it is worldwide and with countries like France, Spain and Italy going into lock-down, those key markets for construction equipment disappear overnight.

For more information on companies in this article

Related Content

  • Sea-changes ahead for bitumen pricing
    May 16, 2020
    Both pricing and – importantly – supply patterns will change.
  • The World Bank asks how to Accelerate Progress on the SDGs and Respond to the COVID Crisis?
    August 26, 2020
    South Africa prioritises transport. By Dr Nancy L Vandycke, programme manager, World Bank
  • Demand is changing in the bitumen market
    August 22, 2013
    The supply and demand for bitumen around the world is changing; refineries, suppliers and contractors must all make changes too - Kristina Smith reports These are interesting times for those supplying and buying bitumen. Almost every part of the picture is in flux: global demand is shifting dramatically; major suppliers are following demand; refineries are closing down or stopping production of bitumen. “In Europe and globally there is a very big chain of events happening,” said Bernd Schmidt, CEO o
  • JCB Ecomax Tier 4 Final engines destined for Terex GB dumpers
    December 8, 2014
    JCB has won one of the biggest engine supply deals after securing an annual contract with Terex GB worth around £4.5 million. The agreement sees JCB supply Terex with engines for site dumpers made at Terex’s plant in the city of Coventry. The engines, made by JCB Power Systems in Derbyshire, UK, will be the fuel efficient Ecomax 55kW/74HP stage3B/Tier 4 Final models. Initially, they will power two Terex site dumper models, the TA6 and TA6S. JCB chief executive Graeme Macdonald said the “major mil