Skip to main content

Italy: Astaldi takes out loan for Turkish motorway project

Italian civil engineering group Astaldi has underwritten a €4.5 billion (US$5 billion) loan towards the Turkish motorway project of Gebze-Orhangazi-Izmir, which is worth an overall €5.65 billion ($6.4 billion). According to the La Repubblica newspaper, the loan facility will be used to complete the 301km last stretch of the motorway and link the city of Bursa, south of the Sea of Marmara, and the Aegean port of Izmir. Part of the loan will be used to refinance stretches that are under construction for
June 18, 2015 Read time: 2 mins
Italian civil engineering group 1324 Astaldi has underwritten a €4.5 billion (US$5 billion) loan towards the Turkish motorway project of Gebze-Orhangazi-Izmir, which is worth an overall €5.65 billion ($6.4 billion).

According to the La Repubblica newspaper, the loan facility will be used to complete the 301km last stretch of the motorway and link the city of Bursa, south of the Sea of Marmara, and the Aegean port of Izmir.

Part of the loan will be used to refinance stretches that are under construction for the Gebze-Orhangazi-Bursa link.

The pool of Turkish creditor banks include Akbank, Garanti Bankasi and Yapi Kredi.

The overall project includes a 3.3km Izmit Bay suspension bridge and will be, when finished, a 377km six-lane motorway with 44km of access roads. The project was started in October 2010 and is set to be completed by 2018. It will shorten the distance between Gebze and Izmir by more than 140km.

Also being built are 30 viaducts totalling 18.21km, four tunnels totalling 7.4km and more than 200 bridges.

The project also includes 18 toll collection centres, five maintenance and operation centres, seven service areas and seven park areas.

The project’s first phase is the 53km Gebze-Orhangazi section, for which an engineering procurement and construction (EPC) contract worth nearly €4.67 billion was awarded to the joint venture NOMAYG in late 2011. The Izmit Bay suspension bridge is within this section.

For more information on companies in this article

Related Content

  • Last section of Osman Gazi Bridge lifted into place over Izmit Gulf
    May 4, 2016
    The last section of the 3km İzmit Bay Bridge – now officially the Osman Gazi Bridge - was lifted into place on April 21, according to Turkish media. When open later this summer, the bridge will cut the 70-minute drive around İzmit Gulf, on the Sea of Marmara, to just six minutes.
  • Turkey is investing in new motorway and bridge projects
    May 29, 2013
    Turkey is benefiting from new motorway and bridge projects constructed along the BOT model - Gülay Malkoç. Looking at Turkey’s economic development, road construction plays a crucial role. The investment in Turkey is becoming increasingly attractive for both local and foreign investors. There are significant huge road investments and projects being made in Turkey at present, compared with EU countries where the roads need mostly repair and maintenance. According to the approach of Turkey’s Ministry of Trans
  • Egis has been awarded a major Turkish highway deal
    June 25, 2013
    Egis has signed a contract for the operation and maintenance of the Gebze-İzmir highway in Turkey. The agreement was signed with OTOYOL, the concessionaire for the Turkish General Directorate of Highways (KGM). This is the second major contract award for Egis in Turkey, following the Eurasia Tunnel deal, for a 5.4km twin-deck tunnel under the Bosphorus. OTOYOL was selected by KGM as the private concessionaire for the project. OTOYOL itself is a firm established for the purpose of the Project by five Turkish
  • Bosphorus crossing updates
    November 29, 2013
    A group of seven banks is to fund the construction of the third Bosphorus Bridge crossing in Turkish commercial centre Istanbul. A group of six Turkish banks, Garanti Bankasi, Halk Bankasi, Is Bankasi, Vakiflar Bankasi, Ziraat Bankasi, and Yapi Kredi Bankasi, is being joined by the Netherlands-based Garantibank International to provide the necessary US$2.3 billion of funding required for the project. A joint Italian-Turkish consortium comprising Astaldi and IC Ictas will build the bridge, which will reduce