Skip to main content

Italian highway tenders underway

Tendering is underway for key Italian highways.
By MJ Woof February 4, 2020 Read time: 1 min
Tendering is opening in Italy for a number of the country’s key highway routes

Tendering is underway in Italy for the concessions for four important highway connections. These routes run between Tuscany and Liguria and the concessions are worth a total of €2.5 billion. The 12-year concession packages will be grouped together, with the tendering being managed by Italy’s Ministry of Transport (MIT).

Related Content

  • Serbia upgrading infrastructure
    May 2, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci. So far some 180km of the Corridor 10 highway has been built over a 40 month time frame. A further 150km of the highway has still to be built. Work on the Corridor 10 motorway is also being financed by the European Bank for Reconstruction and Development and the state budget. Wh
  • Serbia upgrading infrastructure
    March 16, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci.
  • Italian road maintenance contracts for Cossi Costruzioni
    March 22, 2022
    Italian contractor Cossi Costruzioni will work on a major road maintenance package.
  • Poland highway tender process opening
    January 3, 2017
    The tender process is opening in Poland for a stretch of highway connecting Napierki with Mlawa. This 14km stretch of the S7 dual carriageway is the first of four sections of the route to be offered for tender. The bidding process for the project is being managed by the Polish General Directorate for National Roads and Motorways (GDDKiA). Bids have to be received by the 21st February 2017, with 18 firms having been invited to tender for the work. The total value of the work to construct the four sections of