Skip to main content

Interest strong for Colombia key tunnel project

Interest is strong in the project to complete Colombia’s key tunnel construction contract. In all 23 firms have shown interest in the package of works to complete the La Linea tunnel project, according to the Colombian national road institute (Invias). The Colombian Government is providing US$204.5 million to complete the project. The current target is for the tunnel to be completed by 2020, although the link was originally supposed to be ready for traffic in late 2016. Construction work on the link commenc
January 22, 2019 Read time: 2 mins
Interest is strong in the project to complete Colombia’s key tunnel construction contract. In all 23 firms have shown interest in the package of works to complete the La Linea tunnel project, according to the Colombian national road institute (2812 Invias). The Colombian Government is providing US$204.5 million to complete the project. The current target is for the tunnel to be completed by 2020, although the link was originally supposed to be ready for traffic in late 2016. Construction work on the link commenced in 2008 and when it finally opens to traffic the tunnel will be 8.6km in length, making it the longest road tunnel in Latin America. The project has been subject to a string of delays, with unforeseen geological challenges having hindered progress during the early stages, and financing shortcomings having posed problems later on.


The La Linea tunnel forms part of the Cruce de la Cordillera Central road link, which will connect Calarca in Quindio Department with Cajamarca in Tolima Department. The existing stretch of National Route 40 between the two towns is narrow and features numerous sharp curves as it passes through a mountain region. The road has a poor safety record, with a crash rate around four times higher than the average for Colombian roads, and is struggling to cope with the volume of traffic it handles. Upgrading the National Route 40 stretch will help boost capacity and safety, and also cut journey times for drivers. The project includes building 31 bridge and 25 tunnel sections, three interchanges and 18km of dual carriageway.

For more information on companies in this article

Related Content

  • FCC heads group that will build Toyo Tunnel in Colombia
    November 6, 2015
    Spanish environmental services, infrastructure and water group FCC has secured a €392 deal to design, build, operate and maintain the 10km Toyo Tunnel in Urabá Port, Colombia. The Government of Antioquia awarded the project to the consortium in which Madrid-based FCC has a 40% share and a group of local business people hold 60%. The tunnel is around 80km from Medellin, the capital of Colombia’s mountainous Antioquia province. The US$426 million contract is for 10 years, during which design and constru
  • Russia's key highway development project
    February 8, 2012
    One of the largest construction programmes in Europe is being carried out to get a Russian resort ready for the Winter Olympics. Patrick Smith reports
  • Russia's key highway development project
    May 28, 2012
    One of the largest construction programmes in Europe is being carried out to get a Russian resort ready for the Winter Olympics. Patrick Smith reports. Daytime temperatures top 30°C in September, and with hundreds of shops and hotels, it is not difficult to see why Sochi has become Russia's premier holiday playground. The city, on the east coast of the Black Sea, near the border with Georgia, bustles with tourists, and this is boosted with delegates at the 9th International Investment Forum Sochi 2010.
  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk