Skip to main content

Interest strong for Colombia key tunnel project

Interest is strong in the project to complete Colombia’s key tunnel construction contract. In all 23 firms have shown interest in the package of works to complete the La Linea tunnel project, according to the Colombian national road institute (Invias). The Colombian Government is providing US$204.5 million to complete the project. The current target is for the tunnel to be completed by 2020, although the link was originally supposed to be ready for traffic in late 2016. Construction work on the link commenc
January 22, 2019 Read time: 2 mins
Interest is strong in the project to complete Colombia’s key tunnel construction contract. In all 23 firms have shown interest in the package of works to complete the La Linea tunnel project, according to the Colombian national road institute (2812 Invias). The Colombian Government is providing US$204.5 million to complete the project. The current target is for the tunnel to be completed by 2020, although the link was originally supposed to be ready for traffic in late 2016. Construction work on the link commenced in 2008 and when it finally opens to traffic the tunnel will be 8.6km in length, making it the longest road tunnel in Latin America. The project has been subject to a string of delays, with unforeseen geological challenges having hindered progress during the early stages, and financing shortcomings having posed problems later on.


The La Linea tunnel forms part of the Cruce de la Cordillera Central road link, which will connect Calarca in Quindio Department with Cajamarca in Tolima Department. The existing stretch of National Route 40 between the two towns is narrow and features numerous sharp curves as it passes through a mountain region. The road has a poor safety record, with a crash rate around four times higher than the average for Colombian roads, and is struggling to cope with the volume of traffic it handles. Upgrading the National Route 40 stretch will help boost capacity and safety, and also cut journey times for drivers. The project includes building 31 bridge and 25 tunnel sections, three interchanges and 18km of dual carriageway.

For more information on companies in this article

Related Content

  • Study for Colombia’s key city route
    October 6, 2016
    A feasibility study is underway for the highway project to connect Colombia’s capital Bogota with the country’s second city, Medellin. The 427km route will be of major benefit to the country by cutting journey times between the two cities to around five hours. However the project looks likely to face serious challenges, particularly with regard to the topography of key sections of the route. Tunnels may have to be constructed to avoid some of the steeper climbs on the current route. Widening the existing ro
  • Controversial £2 billion Stonehenge bypass project halted
    July 30, 2024
    The UK's controversial £2 billion Stonehenge bypass project has been halted, prompting relief amongst environmentalists and historians who opposed the construction work.
  • UK Government finalising plans for Stonehenge road tunnel
    January 12, 2017
    The UK Government is finalising its plans for the construction of a road tunnel close to the famous Stonehenge monument in Wiltshire. The 2.9km tunnel will carry the A303, a busy road that carries heavy traffic, particularly during the holiday season when large numbers of tourists pass through the area. The existing route passes close to the Stonehenge monument but the road is widely recognised as being unfit for purpose. As well as carrying cars, it handles a high percentage of large trucks, including heav
  • Taking the coast road on Reunion Island
    April 4, 2017
    An ambitious project on Reunion Island will improve transport