Skip to main content

Interest strong for Colombia key tunnel project

Interest is strong in the project to complete Colombia’s key tunnel construction contract. In all 23 firms have shown interest in the package of works to complete the La Linea tunnel project, according to the Colombian national road institute (Invias). The Colombian Government is providing US$204.5 million to complete the project. The current target is for the tunnel to be completed by 2020, although the link was originally supposed to be ready for traffic in late 2016. Construction work on the link commenc
January 22, 2019 Read time: 2 mins
Interest is strong in the project to complete Colombia’s key tunnel construction contract. In all 23 firms have shown interest in the package of works to complete the La Linea tunnel project, according to the Colombian national road institute (2812 Invias). The Colombian Government is providing US$204.5 million to complete the project. The current target is for the tunnel to be completed by 2020, although the link was originally supposed to be ready for traffic in late 2016. Construction work on the link commenced in 2008 and when it finally opens to traffic the tunnel will be 8.6km in length, making it the longest road tunnel in Latin America. The project has been subject to a string of delays, with unforeseen geological challenges having hindered progress during the early stages, and financing shortcomings having posed problems later on.


The La Linea tunnel forms part of the Cruce de la Cordillera Central road link, which will connect Calarca in Quindio Department with Cajamarca in Tolima Department. The existing stretch of National Route 40 between the two towns is narrow and features numerous sharp curves as it passes through a mountain region. The road has a poor safety record, with a crash rate around four times higher than the average for Colombian roads, and is struggling to cope with the volume of traffic it handles. Upgrading the National Route 40 stretch will help boost capacity and safety, and also cut journey times for drivers. The project includes building 31 bridge and 25 tunnel sections, three interchanges and 18km of dual carriageway.

For more information on companies in this article

Related Content

  • Colombia: Toyo Tunnel award to be made in September
    July 15, 2015
    The contract award for Columbia’s 9.75km Toyo Tunnel project will be made on September 28, according to Columbian media. The tunnel, costing almost US$760, will be part of a new 39km road between Santa Fe de Antioquia and Canasgordas. World Highways reported in January that the central government will contribute $216 million towards the project, the regional government of Antioquia department will contribute $337 million and the Medellin city government will pitch in with $212 million. Columbia’s N
  • Linking Kenya and Uganda with a new road project
    May 10, 2018
    An upgraded road link will improve transport between Uganda and Kenya - Shem Oirere reports Rainfall patterns and type of soil in an agricultural rich area shared by the neighbouring East African countries of Kenya and Uganda was a key consideration in arriving at the decision to upgrade to bitumen standards 73km of the 118km Kapchorwa-Kitale road that links the two countries. Initially, Uganda had proposed to have the road between Kapchorwa and Suam on its border with Kenya re-gravelled and widened to a
  • Colombian highway projects being agreed
    March 22, 2017
    Interest is proving strong in Colombia’s Pamplona-Cucuta 4G motorway project, which is currently undergoing the tender process. The country’s National Infrastructure Agency (ANI) has had three bids so far for the project. The 62km stretch of road will be built in Colombia’s Norte de Santander department. The project is expected to cost in excess of US$515 million. So far ANI’s bids have come from CCA Civil Colombia, the Colombia-based subsidiary of Spanish contractor Sacyr, as well as the consortium Estruct
  • Tunnel project for south German town to restart
    August 5, 2019
    Construction work is to restart on a new tunnel project in the South German town of Garmisch-Partenkirchen following the necessary approvals having been received. The town lies to the south of Munich and is a popular winter ski resort, while in summer it also experiences heavy tourist traffic as it lies on a key route between Germany and Austria, as well as Italy, lying to the south. The busy Autobahn 95 connects Munich’s southern side with Garmisch-Partenkirchen. But this route ends just to the northern si