Skip to main content

Interest strong for Colombia key tunnel project

Interest is strong in the project to complete Colombia’s key tunnel construction contract. In all 23 firms have shown interest in the package of works to complete the La Linea tunnel project, according to the Colombian national road institute (Invias). The Colombian Government is providing US$204.5 million to complete the project. The current target is for the tunnel to be completed by 2020, although the link was originally supposed to be ready for traffic in late 2016. Construction work on the link commenc
January 22, 2019 Read time: 2 mins
Interest is strong in the project to complete Colombia’s key tunnel construction contract. In all 23 firms have shown interest in the package of works to complete the La Linea tunnel project, according to the Colombian national road institute (2812 Invias). The Colombian Government is providing US$204.5 million to complete the project. The current target is for the tunnel to be completed by 2020, although the link was originally supposed to be ready for traffic in late 2016. Construction work on the link commenced in 2008 and when it finally opens to traffic the tunnel will be 8.6km in length, making it the longest road tunnel in Latin America. The project has been subject to a string of delays, with unforeseen geological challenges having hindered progress during the early stages, and financing shortcomings having posed problems later on.


The La Linea tunnel forms part of the Cruce de la Cordillera Central road link, which will connect Calarca in Quindio Department with Cajamarca in Tolima Department. The existing stretch of National Route 40 between the two towns is narrow and features numerous sharp curves as it passes through a mountain region. The road has a poor safety record, with a crash rate around four times higher than the average for Colombian roads, and is struggling to cope with the volume of traffic it handles. Upgrading the National Route 40 stretch will help boost capacity and safety, and also cut journey times for drivers. The project includes building 31 bridge and 25 tunnel sections, three interchanges and 18km of dual carriageway.

For more information on companies in this article

Related Content

  • Evonik’s top marks for Colombian tourist highway solution
    May 15, 2014
    Leading German road marking product manufacturer Evonik Industries has played a key role in improving safety on a popular Colombian tourist highway, as Guy Woodford reports Bearing the name of the memorable peacemaker governor of Antioquia, the Guillermo Gaviria Correa road, located between the Colombian municipalities of Medellin and San Jerónimo, connects Medellin to the Uraba Gulf part of the Caribbean Sea. In operation since 2007, the road, in combination with the Fernando Gómez Martínez tunnel –
  • Inauguration of Mexico's Baluarte Bridge
    March 22, 2012
    Mexico’s president Felipe Calderon has inaugurated the new Baluarte Bridge, which crosses the Baluarte River in the Sierra Madre mountain range in the north of the country. This 1.12km long bridge is 403m high at its central point over the steeply sloping ravine it spans, making it the highest cable-stayed structure in the world. Officials from the Guinness Book of Records presented an award to President Calderon, reflecting the Baluarte’s new status as it is higher than the previous holder, the Millau Brid
  • Positive finding for tunnel solution in Malta
    May 2, 2012
    A preliminary study on the proposed tunnel connecting the islands of Malta and Gozo has been carried out by Mott Macdonald. Mott Macdonald’s preliminary analysis of the Malta-Gozo undersea road link suggests that it would take 5-7 years to build a tunnel between the two islands. This report suggests a cost of €156-€492 million for a single bore three-lane tunnel on the shortest practical alignment route. Potentially, the project could be co-financed by the EU under the Cohesion Fund if a road tunnel link be
  • Bids for Višňové Tunnel's IT being evaluated
    March 31, 2023
    The contract, in Slovakia, also includes IT equipment for the D1 motorway stretch Lietavska Lucka - Visnove - Dubna Skala of which the tunnel is a part.