Skip to main content

Indonesia’s new toll road link

Plans are moving ahead in Indonesia for the construction of the Kuala Tanjung toll road project. Financing has been secured for an 80km stretch of the route. This stretch will run from Terbanggi Besar, through Pematang Panggang to Kayu Agung and will cost around US$552.3 million to build. The project for the Kuala Tanjung toll road includes a number of complext and costly elevated sections, between: Krian-Legundi, Bunder and Manyar (KLBM); Jakarta and Cikampek II Elevated; Batang and Semarang; Jakarta and C
March 25, 2019 Read time: 1 min

Plans are moving ahead in Indonesia for the construction of the Kuala Tanjung toll road project. Financing has been secured for an 80km stretch of the route. This stretch will run from Terbanggi Besar, through Pematang Panggang to Kayu Agung and will cost around US$552.3 million to build. The project for the Kuala Tanjung toll road includes a number of complext and costly elevated sections, between: Krian-Legundi, Bunder and Manyar (KLBM); Jakarta and Cikampek II Elevated; Batang and Semarang; Jakarta and Cikampek Sisi Selatan.

The Kuala Tanjung, Tebing Tinggi and Parapat toll road stretch is worth some $1.4 billion. This will connect with the Medan-Kualanamu to Tebing Tinggi and Belawan to Medan-Tj Morawa stretches. It will also join with the new port at Kuala Tanjung port and the Belawan port.

Related Content

  • Multi-million dollar investment in Indonesian road toll projects
    July 12, 2012
    Millions of US dollars are being poured into new and expanding toll road projects in Indonesia. Wijaya Karya (Wika), the Indonesian government-owned construction service provider, will build toll roads linking Kedung Badak to Kedung Halang and Pandaan to Gempol in Bogor through two contracts worth US$36.35million (IDR 340.80bn) and US$23.98million (IDR 225bn), respectively. Awarded by highways operator Jasa Marga (JSMR), the contracts require the roads completion in 18 months.
  • Indonesia toll road opening to traffic
    February 26, 2019
    Work is on track for the building of a key toll road project in Indonesia’s East Kalimantan. The 99.35km toll road runs between Samarinda and Balikpapan and will cut the travel time between the two from three hours to just one hour. The project is costing US$653.2 million to carry out. Work is almost complete for the stretches from Muara Jawa to Palaran and from Samboja to Muara Jawa sections. The section from Balikpapan to Samboja should be ready by April 2019 and the stretch from Samarinda to Palaran shou
  • Indonesia US$5.33bn master plan for access and toll roads
    August 3, 2012
    The Ministry of Public Works in Indonesia has allocated US$5.33 billion (IDR 50.35 trillion) for a development master plan set to include improvements to vital access and toll roads. Among the projects in the Acceleration and Expansion of Economy Development master plan up until 2014 are access roads from Nabire to Narotali; from Manokwari to Sorong in Papua; from Sei Mangke to Kuala Tanjung in North Sumatra; and from Tanjung Priok to the Metropolitan Priority Area. It also includes the Cileunyi-Sumedang-D
  • New plans for Russian roads being built
    March 12, 2019
    Major new highway projects are now progressing in Russia, with more detailed plans being drawn up. Two key projects are for the new Black Sea Coast Highway and the M-4 Don Transport Corridor. The Black Sea Coast Highway has seen some changes to the original proposals, with the high cost of the initial design having been a major factor in the revisions to the plans. The length of the new route will be 80.5km under the new proposals, with the work now costing around US$15 billion, some 2/3rds of the original