Skip to main content

Indonesia’s new toll road link

Plans are moving ahead in Indonesia for the construction of the Kuala Tanjung toll road project. Financing has been secured for an 80km stretch of the route. This stretch will run from Terbanggi Besar, through Pematang Panggang to Kayu Agung and will cost around US$552.3 million to build. The project for the Kuala Tanjung toll road includes a number of complext and costly elevated sections, between: Krian-Legundi, Bunder and Manyar (KLBM); Jakarta and Cikampek II Elevated; Batang and Semarang; Jakarta and C
March 25, 2019 Read time: 1 min

Plans are moving ahead in Indonesia for the construction of the Kuala Tanjung toll road project. Financing has been secured for an 80km stretch of the route. This stretch will run from Terbanggi Besar, through Pematang Panggang to Kayu Agung and will cost around US$552.3 million to build. The project for the Kuala Tanjung toll road includes a number of complext and costly elevated sections, between: Krian-Legundi, Bunder and Manyar (KLBM); Jakarta and Cikampek II Elevated; Batang and Semarang; Jakarta and Cikampek Sisi Selatan.

The Kuala Tanjung, Tebing Tinggi and Parapat toll road stretch is worth some $1.4 billion. This will connect with the Medan-Kualanamu to Tebing Tinggi and Belawan to Medan-Tj Morawa stretches. It will also join with the new port at Kuala Tanjung port and the Belawan port.

Related Content

  • Jasa Marga picks up a loan for the Medan-Kualanamu project
    April 27, 2015
    In Indonesia, state-controlled toll road operator Jasa Marga has secured a loan worth nearly US$124 million to finance its Medan-Kualanamu-Tebing Tinggi (MKTT) toll road project. The loan is secured from a consortium of banks that include Bank BRI, Bank Mandiri and Bank BNI. The total cost of the project is around $315 million. The tender process of the project is being conducted and the winning bidder will be revealed in May. Jasa Marga operates and manages 13 toll road concessions directly and nin
  • Construction work will start shortly on major Indonesian tollroad
    July 22, 2013
    In Indonesia the country’s government intends to speed up preparations for the massive Trans Sumatra tollroad project. This 2,700km highway link is costing close to US$30 billion and much of the work will be carried out by the state-owned contractor, Hutama Kaya. Construction will commence in late-September 2013 and the project is scheduled to be fully open by 2025. This highway will connect all 10 provinces in Sumatra Island through Aceh-Lampung. Phase one of the project is for the construction of four sec
  • Indonesia is expanding its toll road network
    June 13, 2016
    The Indonesian Government is continuing with its massive programme of toll road expansion work. Deals for a number of key projects have now been agreed, with the work costing a total of US$3.63 billion in all. Construction activity will see the development of these important routes. Several of the road projects are being carried out under the PPP model. These include a 30km link in Banten that will connect Serpong with Balaraja, a 37km road in East Java from Pandaan to Malang and a 99km road in East Kaliman
  • Plan in hand for new Indonesian toll road
    July 27, 2015
    Indonesian road firm Jasa Marga will fund work on a major toll road project using a loan from state lenders, Bank Rakyat Indonesia (BRI), Bank Mandiri, Bank Negara Indonesia (BNI) and Bank Sumatera Utara (Bank Sumut). The US$212 million loan will finance work on Jasa Marga's Medan-Kuala Namu-Tebing Tinggi toll road. The route is 61.7km long and will connect Kuala Namu International Airport to other key areas.