Skip to main content

Indonesia’s massive toll road expansion plan

Indonesia has a massive programme of road development aimed at expanding the country’s toll road network. The plan calls for no less than 2,500km of toll roads to be built over the next five years. In all the work is expected to cost anything from US$16.5 billion up to as much as $24.74 billion. To pay for the works, a variety of financing methods are being used, with PPPs, loans and international firms being involved. Key roads being built in Indonesia include the Trans Sumatra, Trans-Java Toll, Jakarta-Bo
October 7, 2019 Read time: 2 mins

Indonesia has a massive programme of road development aimed at expanding the country’s toll road network. The plan calls for no less than 2,500km of toll roads to be built over the next five years. In all the work is expected to cost anything from US$16.5 billion up to as much as $24.74 billion. To pay for the works, a variety of financing methods are being used, with PPPs, loans and international firms being involved. Key roads being built in Indonesia include the Trans Sumatra, Trans-Java Toll, Jakarta-Bogor-Depok-Tangerang-Bekasi and Sulawesi and Kalimantan routes. Construction work is being carried out at a fast pace and during the April-June 2020 period, around 1,852km of the planned toll roads should be ready. The road building work is ahead of the schedule set out in the 2015-2019 National Medium-Term Development Plan (RPJMN) at present.

Related Content

  • Indonesia toll road tender opening
    November 29, 2016
    The tender process for four major toll road projects in Indonesia will commence during 2017. The Indonesian Government is partnering with the World Bank to handle the four projects. The new Bali toll road will improve transport links in Bali, while the construction of the Tegal-Cilacap toll road will provided a much-needed new link in Central Java. Also being planned are the Jogya-Bawen toll road and the Sukabumi-Ciranjang-Padalarang toll road. Indonesia’s Toll Road Regulatory Agency is working on costings
  • India plans major infrastucture investment
    February 10, 2012
    India says it turned its Commonwealth Games into a world-class success, and now it aims to do the same with its infrastructure. Patrick Smith reports. On October, 2010 India put itself on the world stage, and disaster appeared to loom as a catalogue of problems dogged its biggest ever sporting event. Costing nearly US$2 billion to stage, the most expensive Commonwealth Games ever were, according to some, in doubt.
  • India plans major infrastucture investment
    April 5, 2012
    India says it turned its Commonwealth Games into a world-class success, and now it aims to do the same with its infrastructure. Patrick Smith reports On October, 2010 India put itself on the world stage, and disaster appeared to loom as a catalogue of problems dogged its biggest ever sporting event. Costing nearly US$2 billion to stage, the most expensive Commonwealth Games ever were, according to some, in doubt. After years of planning some projects were incomplete, there were health scares and a br
  • Indonesia’s new capital toll road connection
    November 20, 2023
    Indonesia’s new capital toll road connection will be complete in 2024.