Skip to main content

Indonesia’s massive toll road expansion plan

Indonesia has a massive programme of road development aimed at expanding the country’s toll road network. The plan calls for no less than 2,500km of toll roads to be built over the next five years. In all the work is expected to cost anything from US$16.5 billion up to as much as $24.74 billion. To pay for the works, a variety of financing methods are being used, with PPPs, loans and international firms being involved. Key roads being built in Indonesia include the Trans Sumatra, Trans-Java Toll, Jakarta-Bo
October 7, 2019 Read time: 2 mins

Indonesia has a massive programme of road development aimed at expanding the country’s toll road network. The plan calls for no less than 2,500km of toll roads to be built over the next five years. In all the work is expected to cost anything from US$16.5 billion up to as much as $24.74 billion. To pay for the works, a variety of financing methods are being used, with PPPs, loans and international firms being involved. Key roads being built in Indonesia include the Trans Sumatra, Trans-Java Toll, Jakarta-Bogor-Depok-Tangerang-Bekasi and Sulawesi and Kalimantan routes. Construction work is being carried out at a fast pace and during the April-June 2020 period, around 1,852km of the planned toll roads should be ready. The road building work is ahead of the schedule set out in the 2015-2019 National Medium-Term Development Plan (RPJMN) at present.

Related Content

  • Romanian road works moving ahead
    December 9, 2022
    Romanian road works are now moving ahead.
  • JTD aims for six Jakarta toll roads to start in 2015
    October 31, 2014
    Jakarta Tollroad Development (JTD) has said it aims to start construction of the six Jakarta inner city toll roads in the middle of next year. The project, nearly 70km in total and much of it elevated, is at the detailed engineering design stage. The toll roads will connect all five of Jakarta’s municipalities. The first construction stage involving the Semanan-Sunter-Pulogebang toll road is expected to US$1.20 billion. Total cost for the whole project is estimated at up to $3.2 billion. According to
  • Trans-Sumatra costs reach $1.7 billion, according to Hutama Karya
    November 14, 2016
    The cost for completing the three toll road sections of the Trans-Sumatra project will be almost US$1.7 billion, according to a major Indonesian construction firm. Hutama Karya is working on the 140km stretch from Bakauheni-Terbangi Besar, the 28km Palembang-Simpang Indralya section and the 18km Medan-Binjai stretch, said the company’s managing director, Gusti Ngurah Putera The Trans-Sumatran Highway is the primary north-south road, running around 2,500km on the island of Sumatra. It connect the north
  • Indonesia’s key Trans-Sumatra Toll Road
    February 10, 2021
    Indonesia’s key Trans-Sumatra Toll Road work is on track