Skip to main content

Indonesia’s key highway project

Indonesia’s key Trans-Sumatra highway project will be complete in 2024.
By MJ Woof July 21, 2020 Read time: 1 min
Work on Indonesia’s Trans-Sumatra project will be complete in 2024 – image courtesy of © 350jb, Dreamstime.com

Construction work is expected to be complete on Indonesia’s Trans-Sumatra highway project in 2024. In all, the highway will extend some 2,878km. Work is still being carried out on a number of sections of the route, which will be tolled.

Financing has still to be secured for some stretches of the project. In all, the Trans-Sumatra toll road (JTST) is costing close to US$33 billion. The Indonesian Government is providing a portion of the funding required, with a considerably larger portion being secured through bank loans.

The Padang to Pekanbaru toll road, Bengkulu to Palembang toll road and Sibolga to Medana toll road will all connect to the JTST.

Related Content

  • Work starting on Zimbabwe’s important highway
    November 4, 2019
    Construction work is finally getting underway on Zimbabwe’s important A4 Harare to Beitbridge highway project.
  • Indonesian Government commencing new infrastructure projects
    July 3, 2014
    The Indonesian Government is aiming to start work on 16 major infrastructure projects before October 2014. These include the development of Cilamaya Port and its access road at a cost of US$1.25 billion, the Kertajajati and Soekarno-Hatta airport projects and five toll road projects. The toll roads include the Balikpapan-Samarinda connection, the Palu-Parigi link, the Manado-Bitung Toll, the Cibitung-Cilincing road and the Trans Sumatra tolled highway. The Public Works Ministry is offering tenders valued at
  • Cameroon-Chad bridge connection
    April 21, 2023
    A new Cameroon-Chad bridge connection is being built.
  • Many Moroccan motorway projects now in hand
    November 11, 2014
    Morocco’s Casablanca-Rabat motorway accounts for almost 20% of motorway tolls in the country, generating US$25.16 million for Autoroutes du Maroc (ADM) in the first half of 2014, a growth of 4.1% from the previous year. With relatively low maintenance costs (mainly used for widening the road) the Casablanca-Rabat motorway is ADM's most profitable route. The 76km route is travelled by 51,000 vehicles/day, far higher than any other motorway. The Berrechid-Agadir motorway (which includes Berrechid-Marrakesh an