Skip to main content

Indonesia’s key highway project

Indonesia’s key Trans-Sumatra highway project will be complete in 2024.
By MJ Woof July 21, 2020 Read time: 1 min
Work on Indonesia’s Trans-Sumatra project will be complete in 2024 – image courtesy of © 350jb, Dreamstime.com

Construction work is expected to be complete on Indonesia’s Trans-Sumatra highway project in 2024. In all, the highway will extend some 2,878km. Work is still being carried out on a number of sections of the route, which will be tolled.

Financing has still to be secured for some stretches of the project. In all, the Trans-Sumatra toll road (JTST) is costing close to US$33 billion. The Indonesian Government is providing a portion of the funding required, with a considerably larger portion being secured through bank loans.

The Padang to Pekanbaru toll road, Bengkulu to Palembang toll road and Sibolga to Medana toll road will all connect to the JTST.

Related Content

  • More funding needed for key Indonesian project
    July 27, 2023
    More funding is needed for a key Indonesian road project.
  • Indonesia road funding found for two highways
    June 27, 2016
    Financing looks to have been secured for major tolled highway projects in Indonesia. These highways are the 129km Pekan Baru-Dumai route, which forms part of the Trans-Sumatra highway, the 60.5km Cileunyi-Sumedang-Dawuan (Cisumwadu) road and the 39km Manado-Bitung route. A loan from the Asian Infrastructure Investment Bank (AIIB) worth some US$370.2 million is expected to provide around half of the financing required for the Pekan Baru-Dumai route. Meanwhile loans worth a total of $300.2 million from the Ex
  • New bridge planned for key Indonesia link
    July 22, 2013
    A feasibility study worth US$199 million will be carried out for the planned Sunda Straits Bridge in Indonesia. The bridge itself is expected to cost close to $20 billion to construct. It will be of major economic importance for Indonesia by providing a direct road link between the islands of Sumatra and Java. The link will connect Sumatra directly to Indonesia’s capital, Jakarta, and the bridge is expected to be 27km long in all. The Sunda Straits Bridge will actually be a series of links connecting the sm
  • Indonesia’s road revamp is seeing new road transport connections
    July 16, 2018
    Indonesia’s road development programme is continuing, with a series of major projects being carried out across the country that will boost transport connections. State funding will help progress on the Trans-Sumatra toll road, paying for six sections of the road link. In all the 1,480km toll road project is expected to cost nearly US$11.85 billion, with state funding paying for a significant portion of the work So far the state-owned construction firm, Hutama Karya, which is building much of the route has