Skip to main content

Indonesia’s key highway project

Indonesia’s key Trans-Sumatra highway project will be complete in 2024.
By MJ Woof July 21, 2020 Read time: 1 min
Work on Indonesia’s Trans-Sumatra project will be complete in 2024 – image courtesy of © 350jb, Dreamstime.com

Construction work is expected to be complete on Indonesia’s Trans-Sumatra highway project in 2024. In all, the highway will extend some 2,878km. Work is still being carried out on a number of sections of the route, which will be tolled.

Financing has still to be secured for some stretches of the project. In all, the Trans-Sumatra toll road (JTST) is costing close to US$33 billion. The Indonesian Government is providing a portion of the funding required, with a considerably larger portion being secured through bank loans.

The Padang to Pekanbaru toll road, Bengkulu to Palembang toll road and Sibolga to Medana toll road will all connect to the JTST.

Related Content

  • Cameroon highway construction project underway
    August 31, 2021
    Work is now well underway on a key highway project in Cameroon.
  • Nigeria road project; funding approved
    April 30, 2019
    Funding has been approved for an important road project in Nigeria’s Ebonyi State.
  • Major highway improvement project on track in Colombia
    February 29, 2016
    In Colombia plans are now in hand for a major highway improvement project. Concesión Pacífico Tres is joint concession operator of the tolled links for Colombia’s major commercial regions connecting with the Pacific port hub. US firm Milbank, Tweed, Hadley & McCloy has provided advice to Colombian Concessionaire Concesión Pacífico Tres SAS and its sponsors, MHC Ingeniería y Construcción de Obras Civiles and Construcciones El Cóndor, and Costa Rica’s infrastructure company Constructora MECO. The advice was
  • New bridge project for Sri Lanka
    September 30, 2013
    A bridge costing some US$321 million will be built in Sri Lanka to span the Kelani River. This new link will reduce congestion at Baseline Road and in the area of Peliyagoda. The bridge is expected to take three years to construct and will measure 415m long. The project is being funded by the Japan International Cooperation Agency (JICA), which is also funding the design detail and feasibility studies. Meanwhile the Asian Development Bank (ADB) has approved credit $75 million for the construction of roads l