Skip to main content

Indonesia’s key highway project

Indonesia’s key Trans-Sumatra highway project will be complete in 2024.
By MJ Woof July 21, 2020 Read time: 1 min
Work on Indonesia’s Trans-Sumatra project will be complete in 2024 – image courtesy of © 350jb, Dreamstime.com

Construction work is expected to be complete on Indonesia’s Trans-Sumatra highway project in 2024. In all, the highway will extend some 2,878km. Work is still being carried out on a number of sections of the route, which will be tolled.

Financing has still to be secured for some stretches of the project. In all, the Trans-Sumatra toll road (JTST) is costing close to US$33 billion. The Indonesian Government is providing a portion of the funding required, with a considerably larger portion being secured through bank loans.

The Padang to Pekanbaru toll road, Bengkulu to Palembang toll road and Sibolga to Medana toll road will all connect to the JTST.

Related Content

  • Indonesian highway funding package required
    July 14, 2020
    Funding is required for a major Indonesian highway project.
  • Trans-Sumatra costs reach $1.7 billion, according to Hutama Karya
    November 14, 2016
    The cost for completing the three toll road sections of the Trans-Sumatra project will be almost US$1.7 billion, according to a major Indonesian construction firm. Hutama Karya is working on the 140km stretch from Bakauheni-Terbangi Besar, the 28km Palembang-Simpang Indralya section and the 18km Medan-Binjai stretch, said the company’s managing director, Gusti Ngurah Putera The Trans-Sumatran Highway is the primary north-south road, running around 2,500km on the island of Sumatra. It connect the north
  • Construction work will start shortly on major Indonesian tollroad
    July 22, 2013
    In Indonesia the country’s government intends to speed up preparations for the massive Trans Sumatra tollroad project. This 2,700km highway link is costing close to US$30 billion and much of the work will be carried out by the state-owned contractor, Hutama Kaya. Construction will commence in late-September 2013 and the project is scheduled to be fully open by 2025. This highway will connect all 10 provinces in Sumatra Island through Aceh-Lampung. Phase one of the project is for the construction of four sec
  • Indonesia road project financing signed
    November 23, 2015
    A financing deal has been signed for a portion of a major highway project in Indonesia. The US$91 million loan package has been signed between Indonesian infrastructure financing company, Sarana Multi Infrastrucktur (SMI), and contractor, Hutama Karya. This will help pay for work on the 22km Palembang-Indrayala stretch of the 2,700km Trans Sumatra 2,700km highway project. The funds will be made available in three tranches. Funding from state sources will provide the remaining funds required for the Palemban