Skip to main content

Indonesia’s key highway project

Indonesia’s key Trans-Sumatra highway project will be complete in 2024.
By MJ Woof July 21, 2020 Read time: 1 min
Work on Indonesia’s Trans-Sumatra project will be complete in 2024 – image courtesy of © 350jb, Dreamstime.com

Construction work is expected to be complete on Indonesia’s Trans-Sumatra highway project in 2024. In all, the highway will extend some 2,878km. Work is still being carried out on a number of sections of the route, which will be tolled.

Financing has still to be secured for some stretches of the project. In all, the Trans-Sumatra toll road (JTST) is costing close to US$33 billion. The Indonesian Government is providing a portion of the funding required, with a considerably larger portion being secured through bank loans.

The Padang to Pekanbaru toll road, Bengkulu to Palembang toll road and Sibolga to Medana toll road will all connect to the JTST.

Related Content

  • Colombia’s Toyo Tunnel project in hand
    May 31, 2019
    Progress is being made for Colombia’s Toyo Tunnel project. Around 20% of the work has been carried out. Building the tunnel and the first stage of the connecting highway sections in Antioquia includes the construction of 17 bridges, seven tunnel sections and 4.4km of road. Tendering for the second stage of the project is due to start soon and will include building a further 19.4km of highway. The Toyo Tunnel project and the entire highway was originally expected to cost US$603.5 million but is now expected
  • Texas highway construction project underway
    January 4, 2024
    A US$414 million Texas highway construction project is now underway.
  • New Zealand highway repair of earthquake damage
    May 12, 2017
    Up to US$571 million (NZ$812 million) is being provided by the New Zealand Government to repair an earthquake damaged stretch of State Highway 1 (SH1). The section being repaired lies between Christchurch and Picton and was heavile damaged by the earthquake that struck in November 2016. A portion of the necessary repair work has already been carried out. Some additional funding will be provided by New Zealand’s National Land Transport Fund to pay for further road repair works to other coastal connections.
  • Alabama bridge project being proposed again
    December 29, 2021
    Proposals have been made for a new Alabama bridge project.