Skip to main content

Indonesian road firm PT Hutama Karya bullish

The state-owned Indonesian road firm, PT Hutama Karya, is bullish with strong results.
By MJ Woof February 14, 2020 Read time: 2 mins
The Trans-Sumatra Toll Road project will boost the economy of the region image © courtesy of PT Hutama Karya

Indonesia’s state-owned construction company PT Hutama Karya (Persero) reports solid financial performance for the third quarter of 2019. This period ended in September 2019.

According to the company's unaudited financial statements, the firm reported net profit of Rp 2,101 trillion, an increase of 43% from the third quarter 2018.

This was double the September target set last year, and a full 95% of the annual profit target. The firm said that this was achieved by streamlined work flows, efficiency in procurement and general business innovation, so that Cost of Revenue decreased by 82%.

"By the end of 2019, Hutama Karya had finished constructing 469.5km of the JTTS (Trans-Sumatra Toll Road), with 373km of the toll road in full operation, including the 140 m Bakauheni-Terbangi Besar section, the 189km Terbangi Besar-Pematang Panggang-Kayu Agung section, and the 13km Medan-Binjai and 22 km Palembang-Indralaya sections. Meanwhile, the 74km Sigli-Banda Aceh section and 131km Pekanbaru-Dumai sections 1-6 are presently under construction," said president director of Hutama Karya, Bintang Perbowo.

Bintang says that Hutama Karya hopes to finish construction of the Trans-Sumatra Toll Road by 2024 and is ready to work on other strategic national projects. "To finish the construction of Trans-Sumatra for 2024, Hutama Karya requires some Rp460 trillion of total investment. As of September 2019, our company's Gross Gearing Ratio was 0.67, with a Debt Covenant of 2.25. So the company still has a room to add sources of funding," Bintang said.

In order to fulfill the loan portion as one of the funding sources, Hutama Karya is planning to issue a global bond in the near future. "We are currently preparing for the Global Ratings process and other permissions," addd Bintang.

Hutama Karya was assigned by the government to develop and operate the 24-section 2,769km Trans-Sumatra Toll Road, connecting Aceh Province with Lampung Province. Currently, there are 12 priority sections being constructed, which are expected to boost the regional as well as national economy. This mega project also makes Indonesia part of the Asian Highway Network, the land transportation network with 141,000km international standard highways that passes through 32 countries.

"The existence of Trans-Sumatra will provide many logistical as well personal benefits in Sumatra due to shorter travel time, which will reduce the logistics costs for local products, as well as natural resources and other resources which can be distributed faster with affordable cost. The priority is to expedite the mobility of goods and people, such as from Aceh to Belawan Port, Medan and Kualanamu International Airport, which will boost the tourism industry, increase the commuter flow in Stabat-Binjai-Medan, and reduce the congestion in Medan."

Related Content

  • Jasa Marga picks up a loan for the Medan-Kualanamu project
    April 27, 2015
    In Indonesia, state-controlled toll road operator Jasa Marga has secured a loan worth nearly US$124 million to finance its Medan-Kualanamu-Tebing Tinggi (MKTT) toll road project. The loan is secured from a consortium of banks that include Bank BRI, Bank Mandiri and Bank BNI. The total cost of the project is around $315 million. The tender process of the project is being conducted and the winning bidder will be revealed in May. Jasa Marga operates and manages 13 toll road concessions directly and nin
  • Indonesia’s road revamp is seeing new road transport connections
    July 16, 2018
    Indonesia’s road development programme is continuing, with a series of major projects being carried out across the country that will boost transport connections. State funding will help progress on the Trans-Sumatra toll road, paying for six sections of the road link. In all the 1,480km toll road project is expected to cost nearly US$11.85 billion, with state funding paying for a significant portion of the work So far the state-owned construction firm, Hutama Karya, which is building much of the route has
  • Aceh Road Rehabilitation project wins key IRF GRAA award
    May 15, 2014
    The 9.1 magnitude earthquake and resulting series of tsunamis that struck Sumatra, Indonesia, in 2004 destroyed communities in 11 countries. Hardest hit was the Indonesian province of Aceh; an estimated 174,000 people were killed and 500,000 displaced. Basic infrastructure was left in ruin while the primary road along the west coast was destroyed. Vehicles making the trip had to navigate unpaved gravel roads, one-lane temporary bridges, and improvised ferries. Given the cataclysmic events that devastated th
  • Indonesia’s toll roads to join up
    October 30, 2018
    Steady progress is being seen in Indonesia with regard to the construction of its major toll roads. A series of key routes are expected to start operations by the end of 2018. Banten’s Merak Port should be linked to the trans-Java toll road by the end of 2018. The target for the end of 2018 is for 941km of toll roads to have been completed, while the target for the end of 2019 is for 1,852km of toll roads to have been completed. The Pemalang to Batang, Ciawi to Sukabumi, Pejagalan to Pemalang and Surakarta