Skip to main content

Indonesia toll road project starting soon

Work will commence soon on Indonesia’s South Cikampek II-Jakarta toll road project. The 64km highway project is benefiting from funding from the Bank Negara Indonesia, Bank Central Asia, and Bank Mandiri. These have each contributed US$91.06 million. In all, the project is costing $970 million. The project is being managed by Indonesian firm Jasamarga Japek Selatan.
January 14, 2019 Read time: 1 min

Work will commence soon on Indonesia’s South Cikampek II-Jakarta toll road project. The 64km highway project is benefiting from funding from the Bank Negara Indonesia, Bank Central Asia, and Bank Mandiri. These have each contributed US$91.06 million. In all, the project is costing $970 million. The project is being managed by Indonesian firm Jasamarga Japek Selatan.

Related Content

  • Indonesian toll roads
    August 13, 2012
    ijaya Karya (Wika), the Indonesian governmentowned construction service provider, will build toll roads linking Kedung Badak to Kedung Halang and Pandaan to Gempol in Bogor through two contracts worth US$36.35 million and $24 million, respectively. Awarded by highways operator Jasa Marga (JSMR), the contracts require the roads completion in 18 months. The operator of the Tangerang- Merak Toll Road, Marga Mandala Sakti (Marga Mandala), will be allocating U$17 million to increase the toll road’s capacity. It
  • Indonesia’s new toll road link
    March 25, 2019
    Plans are moving ahead in Indonesia for the construction of the Kuala Tanjung toll road project. Financing has been secured for an 80km stretch of the route. This stretch will run from Terbanggi Besar, through Pematang Panggang to Kayu Agung and will cost around US$552.3 million to build. The project for the Kuala Tanjung toll road includes a number of complext and costly elevated sections, between: Krian-Legundi, Bunder and Manyar (KLBM); Jakarta and Cikampek II Elevated; Batang and Semarang; Jakarta and C
  • Indonesia’s important tolled highway underway
    December 10, 2012
    Work is said to be progressing on track in Indonesia with the Trans-Sumatra tolled highway. Construction of the section linking Aceh and Lampung Provinces looks set to be completed by the end of 2014 and is expected to open for traffic in early 2015. So far the work looks to cost in the region of US$625 million, with work being carried out by Hutama Karya. Meanwhile plans are also in hand for a new toll road for heavy trucks only that will connect West Java's Citibung and North Jakarta's Tanjung Priok Port.
  • Indonesia’s Trans Marga Jateng secures key new toll road loan
    April 8, 2014
    A US$415.45 million (IDR 4.7 trillion) loan has been agreed for a new 75.67km toll road as part of the Trans Java toll road project in Indonesia. Trans Marga Jateng, the 60:40 joint venture of Indonesian state-owned toll-road operator Jasa Marga and Central Java's state-owned infrastructure firm Sarana Pembangunan Jawa Tengah, has secured the 15-year syndicated loan from a group of lenders headed by state-owned bank Bank Mandiri. The new toll road will run from Solo to Semarang through Salatiga and Boyola