Skip to main content

Indonesia set for major PPP infrastructure tendering round

The Indonesian government is getting ready to tender for major infrastructure projects including roads to be developed under public-private partnership (PPP) contracts, the Jakarta Post reported. Public Works and Public Housing minister Basuki Hadimuljono said in Jakarta that the first priorities would be on the 94km Balikpapan-Samarinda toll road, the 7km Manado-Bitung toll road in North Sulawesi and a drinking water treatment system project in western Semarang, central Java. The projects will prove that P
March 10, 2015 Read time: 2 mins
The 1065 Indonesian government is getting ready to tender for major infrastructure projects including roads to be developed under public-private partnership (PPP) contracts, the Jakarta Post reported.

Public Works and Public Housing minister Basuki Hadimuljono said in Jakarta that the first priorities would be on the 94km Balikpapan-Samarinda toll road, the 7km Manado-Bitung toll road in North Sulawesi and a drinking water treatment system project in western Semarang, central Java.

The projects will prove that PPP contracts can work in Indonesia and they should help the government’s programme to support an annual economic growth rate of at least 7%, he said.

A tender for the Balikpapan-Samarinda toll road is expected to be ready in May and involves an investment of nearly US$879 million.

“The toll road will be divided into several sections,” he said. “The first section will be funded by the state budget and the fifth section will be funded by provincial budget. Meanwhile, the second, third and fourth sections will be open for tenders since the land acquisition process for those sections is almost finished.”

A tender for the Manado-Bitung toll road, expected to cost around $307 million, would be open by the end of the year, a delay while the government finalises land acquisition, he said.

Other projects that could be out to a PPP contract include the Bontang Refinery project in East Kalimantan and the completion of the Jakarta Mass Rapid Transit project.

Apart from traffic congestion, the Indonesian capital suffers from a high annual rainfall that puts a strain on the drainage system which includes the city’s road infrastructure. To ease the problem, World Highways reported in February that a US$1.88 billion combined road and drainage tunnel is being proposed.

Work is due to start this year, with the initial phase of the construction being carried out by Antaredja Mulia Jaya. The project is calling for two 12km tunnels to be complete in three years. One of the tunnels will link Tanah Abang with Ulujami and the other will connect Manggarai with Bale Kambang.

The project is similar in concept at least to the completed 5333 Stormwater Management and Road Tunnel's section constructed in Malaysian capital Kuala Lumpur.

For more information on companies in this article

Related Content

  • Indonesian road contract awarded
    February 16, 2022
    A major Indonesian road contract has been awarded.
  • JTD aims for six Jakarta toll roads to start in 2015
    October 31, 2014
    Jakarta Tollroad Development (JTD) has said it aims to start construction of the six Jakarta inner city toll roads in the middle of next year. The project, nearly 70km in total and much of it elevated, is at the detailed engineering design stage. The toll roads will connect all five of Jakarta’s municipalities. The first construction stage involving the Semanan-Sunter-Pulogebang toll road is expected to US$1.20 billion. Total cost for the whole project is estimated at up to $3.2 billion. According to
  • Czech Republic re-tenders D4 Pribram and Pisek section as P3 deal
    January 6, 2017
    The Czech Transport Ministry has re-tendered for legal, technical and financial consultancy services regarding the first public-private partnership for a road project. The contract is for construction of a 32km section of the D4 motorway between Pribram and Pisek in South Bohemia. A previous tender for the €3.8 million project was cancelled by the Czech Anti-monopoly Office (UOHS) that suggested it contained flaws. Deadline for bids for the new tender is February 15 with construction of the remaini
  • Four consortia head to second round Czech D4 tender
    November 23, 2018
    Czech Transport Ministry has advanced four out of seven consortia for a €975 million D4 motorway contract between Příbram to Písek. When signed, the 32km 25-year design-build-finance-operate contract will be the first of what the Czech government hopes will be more public-private partnerships. A Vinci-led consortium is one of the chosen groups, consisting of Vinci Highways, Vinci Concessiones and Meridiam Investments of France. Another is a German-Austrian group of Strabag and Hochtief. The third i