Skip to main content

Indonesia: Jasa Marga secures four highway concession deals

Toll road operator Jasa Marga of Indonesia has added four contracts at a cost of nearly US$2.4 billion to its highway concession portfolio. Jasa Marga hold equity of between 55% and 65% in each project, according to a report by the Jakarta Post newspaper. The contracts are for the 40km Bitung-Manado Highway in Sulawesi, the 99km Samarinda-Balikpapan Highway in Kalimantan, the 38km Malang-Pandaan Highway in East Java and the 75km Semarang-Batang Highway in central Java. Netherlands-based Indonesia I
June 8, 2016 Read time: 2 mins
Toll road operator 1083 Jasa Marga of Indonesia has added four contracts at a cost of nearly US$2.4 billion to its highway concession portfolio.

Jasa Marga hold equity of between 55% and 65% in each project, according to a report by the Jakarta Post newspaper.

The contracts are for the 40km Bitung-Manado Highway in Sulawesi, the 99km Samarinda-Balikpapan Highway in Kalimantan, the 38km Malang-Pandaan Highway in East Java and the 75km Semarang-Batang Highway in central Java.

Netherlands-based Indonesia Investments describes Jasa Marga as a state-controlled toll road operator that constructs and provides toll road services – around 73% of all toll roads.

Earlier this year, 1075 Trans Marga Jateng, the 60:40 joint venture of Jasa Marga and central Java's state-owned infrastructure firm Sarana Pembangunan Jawa Tengah, secured a 15-year loan from a group of lenders headed by state-owned bank Bank Mandiri.

The $415.45 million loan is for 75km toll road as part of the Trans Java toll road project. It will run from Solo to Semarang through Salatiga and Boyolali.

For more information on companies in this article

Related Content

  • BAM half year results show jump in pre-tax profit
    August 19, 2016
    Dutch construction and related services group Royal BAM posted improved half-year results, despite Britain’s decision to leave the European Union. Half-year results to June showed pre-tax profit to €45 million, up from €4 million the previous year. However, group revenue slipped back €3.4 billion, down from around €3.5 billion. Construction and mechanical & electrical services suffered a €23.8 million loss, blamed on poor trading in Germany. But civil engineering and property helped profitability.
  • Contractor Strabag reports strong performance
    April 30, 2013
    Austrian contractor STRABAG reports healthy earnings before interest and taxes (EBIT) of €207 million in 2012. This figure beats the firm’s own expectations and the expectations of the market. Net income after minorities stood at €61 million, showing an expected considerable decrease of 66.67% compared to the year before. “An output volume of €14 billion in 2012 – that’s nothing to complain about. With €13.2 billion, the end-of-the-year order backlog is also nearly exactly at the pre-crisis level of 2008, s
  • Trimble helps bring Indonesia up to speed on the latest heavy construction technology
    March 28, 2014
    Indonesian infrastructure investment is seeing major highway expansion - Simon Gould writes Over the next 12 years, Indonesia has planned some massive infrastructure investments, under a master plan aimed at bringing it up to developed country status by 2025. Its Government’s Masterplan for Acceleration and Expansion of Indonesia's Economic Development (MP3EI) envisages infrastructure spending of US$400 billion between 2011 and 2025 to help achieve this (see sidebar for more on MP3EI). With limited funds of
  • Ethiopia announces three road projects worth over $240 million
    April 17, 2015
    In Ethiopia, three road projects worth over US$240 million will be built as part of the country's fourth road sector development plan. The government will fund the projects using its own resources. The first project is the 83km Sodo-Tercha asphalt-concrete project, costing around $84 million and to be built by China Railway Seventh Group. Completion is scheduled for 19 months. The second project, worth $102 million is the 99km Bilbela-Sekota road project, scheduled to take 39 months and to be built