Skip to main content

India’s massive bridge project

India is carrying out a massive bridge project.
By MJ Woof December 9, 2020 Read time: 1 min
A massive new bridge project is planned for India – image courtesy of © Brett Critchley, Dreamstime.com

Construction works are now set to go ahead on a massive bridge project In India. The building work will be carried out by the contractor, L&T Construction. The project will be for the longest bridge in India, spanning the Brahmaputra River. The 19km bridge will link Dhubri in Assam State with Phulbari in Meghalaya State. This will provide a direct road link between the Dhubri and Phulbari, reducing journey times considerably. At present the distance between the two by road is 250km.
 

For more information on companies in this article

Related Content

  • India planning highway projects
    August 10, 2017
    India’s Maharashtra State is setting out a massive programme for infrastructure development. In all some US$47.08 billion of infrastructure works will be carried out. Transport development is a key priority, with a series of major highway construction projects now being planned.
  • Peru highway bridge replacement project
    July 11, 2025
    A Peruvian highway bridge replacement project is required.
  • Bentley’s Be Inspired Awards highlight innovation in software use
    January 6, 2015
    Innovation, from design to on-site execution, is alive and well, thanks to a good helping of software application. David Arminas reports from software developer Bentley’s annual global conference, held this year in London Successful project delivery is increasingly about hard men and women using software to get the job done and this year’s global conference in London by US-based software developer Bentley highlighted some innovative - and startling - examples. As usual, the Year in Infrastructure 2014
  • New bridge link for Nigeria
    February 18, 2019
    Construction work on the important Loko-Oweto Bridge project in Nigeria should be complete in May 2019. The project has cost around US$141 million, with contractor Reynolds Construction Company having started work on the 1.8km structure in 2011. Spanning the River Benue, the bridge forms part of the 108km road link connecting Otukpo with Oweto and improves transport connections between Benue State and Nasarawa State. Work on a stretch of the road has been carried CGC Nigeria Limited. Upgrade work is also