Skip to main content

Impressa Pizzarotti signs Polish S61 dual carriageway deal

Italian infrastructure company Impressa Pizzarotti has signed a deal for work on 24km of Poland’s S61 dual carriageway from Suwalki to the border with Lithuania.
June 12, 2017 Read time: 1 min

Italian infrastructure company Impressa Pizzarotti has signed a deal for work on 24km of Poland’s S61 dual carriageway from Suwalki to the border with Lithuania.

The contract, with the contract with the 3519 Polish General Directorate for National Roads and Motorways (1361 GDDKiA) is for around €144.6 million, according to media reports.

The S61 is part of the greater European route E 67 running from Prague in the Czech Republic to Helsinki in Finland by way of Poland, Lithuania, Latvia and Estonia. It goes via Prague, Warsaw, Riga, Tallinn and – by ferry – Helsinki, a length of nearly 1,700km.

It is also known as the Via Baltica between Warsaw and Tallinn, a distance of 970km. Most of the route is not motorway but some sections, such as the one in Poland, are dual carriageway.

For more information on companies in this article

Related Content

  • Cost of D1 section Hubova-Ivachnova rises 40%
    August 3, 2023
    In Slovakia, the 15km Ružomberok bypass, including the 3.6km Čebrať Tunnel, is now €93 million more expensive than nine years ago.
  • Scottish dual carriageway work facing delays
    February 9, 2021
    Two Scottish dual carriageway projects are facing delays.
  • Bosnia cancels a tender for Corridor 5C, part of European route E73
    March 13, 2017
    Bosnia is cancelling a tender for part of its Corridor 5C project, an integral part of the class-A north-south central European route E73. Route E73 runs around 700km from Hungary south through eastern Croatia to Bosnia and Herzegovina and the Adriatic Sea in the area of Ploče port. The longest part of this corridor goes through Bosnia and Herzegovina – nearly 340km. Director of the Bosnian motorways company Autoput FBiH, Adnan Terzic, confirmed the cancelled tender to the Bosnian daily newspaper Dnev
  • Completion of Prague’s outer ring-road Běchovice section for 2024
    July 24, 2019
    Completion of Prague’s outer ring-road connecting the D1 motorway with Běchovice town to the north should be in 2024, a year earlier than planned. Czech prime minister Andrej Babiš made the announcement, saying the 2025 date set by the Czech Highway Authority was too far off, according to local media. The national Czech News Agency reported that the 12.5km section will cost around €365 million. Transport minister Vladimíra Kremlík said that the state will have to acquire land from up to 500 land ow