Skip to main content

Impressa Pizzarotti signs Polish S61 dual carriageway deal

Italian infrastructure company Impressa Pizzarotti has signed a deal for work on 24km of Poland’s S61 dual carriageway from Suwalki to the border with Lithuania.
June 12, 2017 Read time: 1 min

Italian infrastructure company Impressa Pizzarotti has signed a deal for work on 24km of Poland’s S61 dual carriageway from Suwalki to the border with Lithuania.

The contract, with the contract with the 3519 Polish General Directorate for National Roads and Motorways (1361 GDDKiA) is for around €144.6 million, according to media reports.

The S61 is part of the greater European route E 67 running from Prague in the Czech Republic to Helsinki in Finland by way of Poland, Lithuania, Latvia and Estonia. It goes via Prague, Warsaw, Riga, Tallinn and – by ferry – Helsinki, a length of nearly 1,700km.

It is also known as the Via Baltica between Warsaw and Tallinn, a distance of 970km. Most of the route is not motorway but some sections, such as the one in Poland, are dual carriageway.

For more information on companies in this article

Related Content

  • Polish road tender process underway
    November 8, 2019
    The tender process is underway again for a 24km stretch of road in Poland. Motorways (GDDKiA). Offers have so far been received by Budimex, Unibep, Porr and Polaqua, with the lowest bein
  • Trakcja and Mostostal Warszawa pick up S61 deal in Poland
    July 25, 2018
    A consortium of PRKiI Trakcja and Mostostal Warszawa has signed a contract for construction of an S61 dual carriageway section between the Elk Poludnie to and Wysokie junctions. The work, costing around €159 million, is scheduled for completion in June 2021. The S61 expressway will, when finished, run south from the Polish-Lithuanian border near Budzisko where it will connect with Lithuania’s A5 and intersect with the S8 near Ostrów Mazowiecka. It will also be part of the Via Baltica connecting the Ba
  • Polish Via Carpathia section attracts 11 bids
    July 17, 2020
    Turkish contractor Kolin Insaat has submitted the lowest bid.
  • Czech Republic: permit for D11 section moving ahead
    October 25, 2019
    The Czech highway authority has applied for permits to start work on a 41km stretch of the D11 motorway, from Prague to the border with Poland at a cost of around €853 million. Last year a consortium comprising contractors Eurovia, Metrostav and Swietelsky began work on a stretch of the D11 connecting Hradec Kralove and Smirice in the north of the country with completion of the €100.5 million project in 2022. The D11 motorway connecting Prague and Hradec Králové began in 1978. It is part of European r