Skip to main content

Impressa Pizzarotti signs Polish S61 dual carriageway deal

Italian infrastructure company Impressa Pizzarotti has signed a deal for work on 24km of Poland’s S61 dual carriageway from Suwalki to the border with Lithuania.
June 12, 2017 Read time: 1 min

Italian infrastructure company Impressa Pizzarotti has signed a deal for work on 24km of Poland’s S61 dual carriageway from Suwalki to the border with Lithuania.

The contract, with the contract with the 3519 Polish General Directorate for National Roads and Motorways (1361 GDDKiA) is for around €144.6 million, according to media reports.

The S61 is part of the greater European route E 67 running from Prague in the Czech Republic to Helsinki in Finland by way of Poland, Lithuania, Latvia and Estonia. It goes via Prague, Warsaw, Riga, Tallinn and – by ferry – Helsinki, a length of nearly 1,700km.

It is also known as the Via Baltica between Warsaw and Tallinn, a distance of 970km. Most of the route is not motorway but some sections, such as the one in Poland, are dual carriageway.

For more information on companies in this article

Related Content

  • Eurovia secures a deal for Czech D35 work
    May 30, 2018
    The Czech division of Eurovia has won a €126 million contract for a section of the D35 motorway. The Czech road and motorway management company RSD sealed the deal Eurovia, part of the Vinci Group, for construction of 14.7km between Casy and Ostrov, in the Pardubice region. Eurovia submitted a bid of nearly €126 million for the work that the government and the European Union had estimated in 2016 might cost around €194 million. Other bids had been submitted by M-Silnice and Astaldi. Eurovia recently an
  • Poland to boost high-speed road construction in 2017
    January 24, 2017
    Poland plans to issue a number of major highway construction tenders early this year as part of plan to boost the number of high-speed road projects started in 2017. Around €4.84 billion be spent this year on road construction and maintenance. Expected to be on offer is the missing A1 section between Tuszyn and Czestochowa as well as construction of an S61 dual carriageway from Ostrowia Mazowiecka to Szczuczyn. Polish media reported that around 124km of dual carriageways and motorways were built last
  • US$7.6bn spent on new Polish roads
    April 26, 2012
    PLN 26.4billion (US$7.6billion) was spent on new roads in Poland in 2011, according to a report prepared by the Polish General Directorate for National Roads and Motorways (GDDKiA). The investment resulted in the construction of 205.5km of motorways and 62.2km of dual carriageways.
  • STRABAG will lead A4 highway deal in Poland
    May 9, 2013
    Austrian contractor STRABAG is heading a consortium handling work to complete a section of Poland’s A4 highway between Krzyż and Dębica Pustynia. STRABAG’s subsidiary Heilit+Woerner is responsible for the contract, which was awarded by Poland’s General Directorate for National Roads and Highways (GDDKiA). The contract is worth €236 million (PLN 981 million), of which Heilit+Woerner has a 50% share. The work will be carried out over a 35km section of the route over and 18 month period. The work includes the