Skip to main content

Hungary road construction funding halt from EC

A dispute between the European Commission (EC) and Hungary has halted the flow of funds for road construction projects. The move has seen the EC officially suspending its payments for road construction projects in Hungary. This move means that funding worth €1.15 billion is not being provided. As a result, Hungary is now considering turning to the European Court of Justice to appeal for the funding stream to be revived.
July 21, 2015 Read time: 1 min
A dispute between the 2465 European Commission (EC) and Hungary has halted the flow of funds for road construction projects. The move has seen the EC officially suspending its payments for road construction projects in Hungary. This move means that funding worth €1.15 billion is not being provided. As a result, Hungary is now considering turning to the European Court of Justice to appeal for the funding stream to be revived.

For more information on companies in this article

Related Content

  • European road safety alert
    December 18, 2024
    A European-wide road safety alert!
  • Cameroon key contract construction continues
    March 10, 2020
    Construction work on a key contract in Cameroon is continuing.
  • Work starts on Komarno-Komarom Bridge between Slovakia and Hungary
    October 31, 2017
    Construction has started on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Last summer it was announced that the Hungarian companies Hidepito and Meszaros es Meszaros had won the tender for the 600m bridge but with a price tag of just over €91 million, according to Hungarian media. It was also reported at the time
  • Volvo’s 75 tonne EC750E excavator makes Eastern European debut
    December 18, 2017
    Polish cement company Cementownia Warta has taken delivery of a Volvo EC750E excavator, the first delivery to Eastern Europe, according to the manufacturer. The EC750E crawler model is working at Cementownia Warta’s limestone operations, said Dariusz Gawlak, managing director of Warta and vice president of the Polish Cement Association. Gawlak expects more infrastructure projects coming on stream next year, signalling a general rise in demand for cement.