Skip to main content

Hochtief to replace part of Schwelmetal Bridge in Wuppertal

Hochtief Infrastructure has signed a contract with DEGES Deutsche Einheit Fernstraßenplanungs und Bau to replace the Schwelmetal Bridge on Germany’s A1 highway in Wuppertal. The contract in the city’s Langerfeld district is worth around €28 million. It entails the demolition and new construction of two partial sections of the Schwelmetal Bridge that dates back to the 1960s. Construction will start in mid-2019. Traffic will continue to flow on the A1 and on the Deutsche Bahn rail tracks beneath the bri
September 27, 2018 Read time: 2 mins
The Schwelmetal Bridge on Germany’s A1 highway in Wuppertal
Hochtief Infrastructure has signed a contract with DEGES Deutsche Einheit Fernstraßenplanungs und Bau to replace the Schwelmetal Bridge on Germany’s A1 highway in Wuppertal.


The contract in the city’s Langerfeld district is worth around €28 million. It entails the demolition and new construction of two partial sections of the Schwelmetal Bridge that dates back to the 1960s. Construction will start in mid-2019.

Traffic will continue to flow on the A1 and on the Deutsche Bahn rail tracks beneath the bridge. The construction work will be carried out in such a way that the outer lanes of the highway will largely remain in operation. During the course of the project, the superstructure and piers will be replaced.

“Hochtief is already building the Lennetal Bridge, as well as the Brunsbecke and Kattenohl Viaducts on the A 45,” said Richard Pohl, manager of the Germany West branch of Hochtief Infrastructure.

Related Content

  • New traffic solutions for the UK
    July 15, 2015
    Two major developments being introduced will help optimise traffic flow on routes carrying high volumes of vehicles/day. An installation of Flexicon’s flexible conduit will help keep the traffic flowing on one of the busiest sections of the M6 motorway through Birmingham by protecting power and data cabling for overhead gantries and CCTV cameras. On behalf of Highways England, who is implementing a hard shoulder running scheme between junctions 5 and 8, contractor’s Carillion is using the 63mm diameter L
  • Czech bridge facing demolition over condition concerns
    October 29, 2018
    A bridge located in Prague, capital of the Czech Republic, is facing calls for its demolition. Concern has been expressed over the condition of the Hlavka Bridge, which spans the Vltava River. The bridge carries heavy vehicle traffic as well as trams and is one of the city’s major transport arteries. It was built originally from 1909 to 1912, replacing an earlier wooden structure. It was then rebuilt so as to cope with vehicle traffic and at present carries up to 100,000 vehicles/day, making it one of the b
  • Julián Núñez, head of ASECAP offers a little Spanish enlightenment
    May 1, 2018
    Julián Núñez, president of ASECAP, gets his teeth into the vision of a European strategy for toll roads. David Arminas reports from Madrid Getting European politicians to agree to a long-term cross-border highway infrastructure programme for toll roads is extremely difficult. It’s a bit like pulling teeth. People want to avoid the pain. This is perhaps a bad analogy to use in the case of Julián Núñez, president of ASECAP - European Association of Operators of Toll Road Infrastructures. Núñez had just sat
  • New version of world’s longest floating bridge
    August 12, 2014
    The creation of a new version of the world’s longest floating bridge in Seattle, in the US state of Washington, is among the world’s most eye-catching current bridge engineering projects. It is an impressive example of the health of the bridge replacement sector, particularly in the US, leaving it well placed for growth. Guy Woodford reports Already the world’s longest floating bridge at over 2,310m long, the Governor Albert D Rosellini-Evergreen Point Floating Bridge in Seattle in the United States is g