Skip to main content

Hochtief to replace part of Schwelmetal Bridge in Wuppertal

Hochtief Infrastructure has signed a contract with DEGES Deutsche Einheit Fernstraßenplanungs und Bau to replace the Schwelmetal Bridge on Germany’s A1 highway in Wuppertal. The contract in the city’s Langerfeld district is worth around €28 million. It entails the demolition and new construction of two partial sections of the Schwelmetal Bridge that dates back to the 1960s. Construction will start in mid-2019. Traffic will continue to flow on the A1 and on the Deutsche Bahn rail tracks beneath the bri
September 27, 2018 Read time: 2 mins
The Schwelmetal Bridge on Germany’s A1 highway in Wuppertal
Hochtief Infrastructure has signed a contract with DEGES Deutsche Einheit Fernstraßenplanungs und Bau to replace the Schwelmetal Bridge on Germany’s A1 highway in Wuppertal.


The contract in the city’s Langerfeld district is worth around €28 million. It entails the demolition and new construction of two partial sections of the Schwelmetal Bridge that dates back to the 1960s. Construction will start in mid-2019.

Traffic will continue to flow on the A1 and on the Deutsche Bahn rail tracks beneath the bridge. The construction work will be carried out in such a way that the outer lanes of the highway will largely remain in operation. During the course of the project, the superstructure and piers will be replaced.

“Hochtief is already building the Lennetal Bridge, as well as the Brunsbecke and Kattenohl Viaducts on the A 45,” said Richard Pohl, manager of the Germany West branch of Hochtief Infrastructure.

Related Content

  • Elevated thinking
    July 30, 2019
    A Swiss-designed system for the diversion of traffic away from road maintenance crews could be revolutionary, reports David Arminas Switzerland will soon tender for companies to build and supply a mobile system for physically shifting traffic away from bridge and road maintenance crews. The federal highways agency - FEDRO - will be asking manufacturers of heavy equipment to submit bids starting this summer for the Astra Bridge system. The system will be two lanes wide and include ramp sections at e
  • Denmark: construction of Storstrøm Bridge officially gets underway
    September 27, 2018
    Denmark’s Minister of Transport Ole Birk Olesen has turned the sod to officially start construction of the new 4km road and rail Storstrøm Bridge. The €549 million bridge is scheduled to open for road traffic in 2022 and for rail traffic in 2023. The project budget includes the cost for demolition of the existing bridge that opened in 1937. The 24m-wide single-support cable-stayed structure will connect the islands of Zealand to Falster and touch down on the smaller Masnedø Island.
  • Canada: work officially starts on Montreal’s Champlain Bridge
    June 25, 2015
    Canada’s infrastructure minister, Denis Label, officially broke ground for Montreal’s replacement Champlain Bridge, saying the project will likely cost US$3.42 billion. The 3.4km Champlain Bridge Corridor Project, including spans and highway expansions, is expected to be completed by 2019. SNC-Lavalin, the 50% stakeholder in the winning consortium Signature on the Saint-Lawrence, recently announced it had finalised the deal with new Champlain Bridge owner Infrastructure Canada. Signature on the Saint-
  • Innovative, flexible bridge formwork systems
    February 14, 2012
    Innovative formwork systems have been used to construct a variety of bridge structures. Patrick Smith reports. As part of the work on Germany's new A4 autobahn near Eisenach, the contracting joint venture awarded the formwork contract for two of the three viaducts to Doka. What makes this assignment so special to the company is that although the two steel composite bridges each have very different cross-sections, the JV is using the same overslung composite forming carriage to pour the carriageway slabs of