Skip to main content

Hochtief buys out Bilfinger to take control of Herren Tunnel Lubeck

Global infrastructure group Hochtief has acquired the 50% of shares in Germany’s Herren Tunnel Lübeck toll road from industrial services provider Bilfinger. The acquisition brings Hochtief’s ownership to 100% and full operational control of the 30-year public-private partnership between Hochtief Solutions and Bilfinger Berger Project Investments. A contract with the project company Herrentunnel Lubeck, 50-50 joint venture, was signed in March 1999 and construction started in October 2001.Herrentunnel
March 14, 2016 Read time: 2 mins
Picture courtesy of Hochtief
Global infrastructure group 981 Hochtief has acquired the 50% of shares in Germany’s Herren Tunnel Lübeck toll road from industrial services provider Bilfinger.

The acquisition brings Hochtief’s ownership to 100% and full operational control of the 30-year public-private partnership between Hochtief Solutions and Bilfinger Berger Project Investments.

A contract with the project company Herrentunnel Lubeck, 50-50 joint venture, was signed in March 1999 and construction started in October 2001.Herrentunnel Lubeck planned, financed and built the project and is operating the tunnel until 2035 when it will be handed over to the Hanseatic City of Lubeck

The 1km tunnel in Lubeck, northern Germany, cost around €78.5 million and is one of Germany’s first toll roads. It is part of the 2.1km toll road that runs under the Trave River. The tunnel replaced a bascule bridge over the Trave River which was not fully functional at the time.

A statement by Hoctief in 2005 said that the total investment was €176 million, of which the German federal government contributed €90 million - the same for construction and maintenance of a new bridge.

For more information on companies in this article

Related Content

  • VIDEO: Companies pre-qualify for Fehmarnbelt Fixed Link consulting
    November 3, 2016
    4782 Femern, the company charged with building what will be the world’s longest submerged tunnel, has prequalified companies for consulting work.

    The companies will be able to tender for two framework agreements, one for client consulting services and the other for technical in-house consulting services.

    Femern is responsible for building the 18km Fehmarnbelt Fixed Link immersed tunnel between Rødbyhavn in Denmark and Puttgarden in Germany. The estimated cost has increased over the past several years to reach around €7.4 billion.
  • Shortlist set for Lower Thames tunnel work
    April 9, 2021
    Bam Nuttal, Bouygues, Dragados and Hochtief are in the running for the UK project.
  • Rader Hochbrücke construction set for summer
    April 7, 2025
    Work on the Rader Hochbrücke (bridge) near Rendsburg, Germany, will start this summer and take five years, according to DEGES.
  • Work to start on Fehmarn Belt link to start in autumn
    April 4, 2019
    Construction of the Fehmarn Belt Fixed Link between Denmark and Germany should start this autumn for completion in 2028, according to the Danish government. Danish company Femern, which is responsible for the construction of the link, will begin negotiations with two contractor consortiums for the first of the project’s works which will start on the Danish side. A tunnel element fabrication yard and a works harbour must be built in Rødbyhavn, as well as a tunnel portal on Lolland. An autumn start wou