Skip to main content

Hochtief buys out Bilfinger to take control of Herren Tunnel Lubeck

Global infrastructure group Hochtief has acquired the 50% of shares in Germany’s Herren Tunnel Lübeck toll road from industrial services provider Bilfinger. The acquisition brings Hochtief’s ownership to 100% and full operational control of the 30-year public-private partnership between Hochtief Solutions and Bilfinger Berger Project Investments. A contract with the project company Herrentunnel Lubeck, 50-50 joint venture, was signed in March 1999 and construction started in October 2001.Herrentunnel
March 14, 2016 Read time: 2 mins
Picture courtesy of Hochtief
Global infrastructure group 981 Hochtief has acquired the 50% of shares in Germany’s Herren Tunnel Lübeck toll road from industrial services provider Bilfinger.

The acquisition brings Hochtief’s ownership to 100% and full operational control of the 30-year public-private partnership between Hochtief Solutions and Bilfinger Berger Project Investments.

A contract with the project company Herrentunnel Lubeck, 50-50 joint venture, was signed in March 1999 and construction started in October 2001.Herrentunnel Lubeck planned, financed and built the project and is operating the tunnel until 2035 when it will be handed over to the Hanseatic City of Lubeck

The 1km tunnel in Lubeck, northern Germany, cost around €78.5 million and is one of Germany’s first toll roads. It is part of the 2.1km toll road that runs under the Trave River. The tunnel replaced a bascule bridge over the Trave River which was not fully functional at the time.

A statement by Hoctief in 2005 said that the total investment was €176 million, of which the German federal government contributed €90 million - the same for construction and maintenance of a new bridge.

For more information on companies in this article

Related Content

  • Russia's key highway development project
    May 28, 2012
    One of the largest construction programmes in Europe is being carried out to get a Russian resort ready for the Winter Olympics. Patrick Smith reports. Daytime temperatures top 30°C in September, and with hundreds of shops and hotels, it is not difficult to see why Sochi has become Russia's premier holiday playground. The city, on the east coast of the Black Sea, near the border with Georgia, bustles with tourists, and this is boosted with delegates at the 9th International Investment Forum Sochi 2010.
  • ACE/AECOM report: private sector and user-pay for English roads
    May 14, 2018
    It’s one minute to midnight for funding England’s roads, according to a timely new report, and the clock’s big hand is pointing to some form of user-pay solution, reports David Arminas Is there any way out of future user-pay funding for England’s highway infrastructure? The answer is a resounding ‘no’, according to the recently published report: Funding Roads for the Future. The brief 25-page document by the London-based Association for Consultancy and Engineering, ACE**, sums up the state of England’s ro
  • RFQ is out for the Gordie Howe Bridge to link US and Canada
    July 22, 2015
    The bidding process has started for the Gordie Howe International Bridge that will link Detroit in the US state of Michigan and Windsor, in the Canadian province of Ontario. The Windsor-Detroit Bridge Authority (WDBA) has sent out a request for qualifications (RFQ) for the bridge that will likely be either cable stayed or suspension to cross the Detroit River. The bridge also likely will come with a hefty price tag – around US$1.62 billion, as World Highways reported in May in a feature on the proposed b
  • Belgrade to get a tunnel between Savska and Dunavska
    May 26, 2017
    A tunnel is to be built between the Belgrade city areas of Savska and Dunavska Padina at a cost between €100-130 million, according to the mayor. Project design was done Ces Cowi which was awarded a tender worth nearly €198,000 by the Directorate for Construction Land. The 9.6m-wide tunnel will be nearly 2km long and lay around 38m below ground. Work, however, is not expected to start until the end of 2018 and take around 30 months. Meanwhile, work on the 470m Zezeljev Bridge across the Danube River in Novi