Skip to main content

Ho Chi Minh City pushes ahead with Thu Thiêm Bridge 4 project

Authorities in Vietnam’s southern Ho Chi Minh City are seeking prime ministerial approval for the nearly 2.2km-long Thu Thiêm Bridge 4 project. The six-lane bridge will cost more than US$230 million and be a build-transfer contract, according to a report in the Vietnam Investment Review. In September, Ho Chi Minh’s City’s People’s Committee said it is considering three investors for the work - Phát Đạt Corporation Real Estate Development, Investment Corporation 620 and 168 Construction Development Investmen
April 18, 2017 Read time: 2 mins
Authorities in Vietnam’s southern Ho Chi Minh City are seeking prime ministerial approval for the nearly 2.2km-long Thu Thiêm Bridge 4 project.

The six-lane bridge will cost more than US$230 million and be a build-transfer contract, according to a report in the Vietnam Investment Review.

In September, Ho Chi Minh’s City’s People’s Committee said it is considering three investors for the work - Phát Đạt Corporation Real Estate Development, Investment Corporation 620 and 168 Construction Development Investment JSC.

The 705m bridge connecting the city’s districts 2 and 7 is expected to have a vertical clearance of 45m above the Saigon River, similar to that of the cable-stayed Phú Mỹ Bridge, opened after two years of construction in 2009.

The six-lane Phu My Bridge was built by a consortium consisting of Baulderstone, Bilfinger Berger, 1388 Freyssinet International and the Vietnamese concrete and formwork company CC620. The bridge designer was the French consultant Arcadis and approach road designer was Cardno. Project manager was 1397 AECOM. The main span is 380m long and the bridge has a 27m-wide main span deck.

While the city is not located on the coast, bridges must still be high enough to allow passage of large ships navigating inland along the Saigon River, making bridges costly, the Ministry of Transport reportedly said.

The new bridge is part of a larger plan to make transport and shipping more efficient in Vietnams largest city by population and the country’s economic capital. Between 2020-2030, 11 ports and piers handling ships up to 30,000tonnes on the Saigòn River will be relocated. New road layouts will be constructed for the piers.

More than 10 million live in Ho Chi Minh’s metropolitan area.

For more information on companies in this article

Related Content

  • Vietnam’s massive expressway expansion
    March 6, 2025
    Vietnam is working on a massive expansion of its expressway network.
  • Vietnam: work on Phuoc Khanh cable stayed bridge to begin in August
    June 22, 2015
    Work on Vietnam’s 3.1km Phuoc Khanh cable stayed bridge will start in August after a deal was signed with the government in June. The contract was signed by the Vietnam Expressway Corporation and a consortium made up of Japanese contractor Sumitomo Mitsui and local partner Civil Engineering Construction Corporation (Cienco 4). The bridge is part of the 57km Ben Luc-Long Thanh Expressway project running through Long An Province, Ho Chi Minh City and Dong Nai province in southern Vietnam. The highway will a
  • Road works planned for Ho Chi Minh City
    August 14, 2023
    Further road works are planned for Ho Chi Minh City.
  • Elevated highway in Vietnam starting construction
    December 12, 2016
    Construction work on a new elevated highway route through Vietnamese conurbation Ho Chi Minh City is commencing. The project involves building a 30.4km stretch of highway, Elevated Road No5, through the busy metropolis and is expected to cost US$785.25 million. The new four lane road will run above National Highway 1A, with the work forming part of a wider project intended to help reduce Ho Chi Minh City’s chronic congestion problems. In all the city’s road transport department plans to construct five of th