Skip to main content

Ho Chi Minh City pushes ahead with Thu Thiêm Bridge 4 project

Authorities in Vietnam’s southern Ho Chi Minh City are seeking prime ministerial approval for the nearly 2.2km-long Thu Thiêm Bridge 4 project. The six-lane bridge will cost more than US$230 million and be a build-transfer contract, according to a report in the Vietnam Investment Review. In September, Ho Chi Minh’s City’s People’s Committee said it is considering three investors for the work - Phát Đạt Corporation Real Estate Development, Investment Corporation 620 and 168 Construction Development Investmen
April 18, 2017 Read time: 2 mins
Authorities in Vietnam’s southern Ho Chi Minh City are seeking prime ministerial approval for the nearly 2.2km-long Thu Thiêm Bridge 4 project.

The six-lane bridge will cost more than US$230 million and be a build-transfer contract, according to a report in the Vietnam Investment Review.

In September, Ho Chi Minh’s City’s People’s Committee said it is considering three investors for the work - Phát Đạt Corporation Real Estate Development, Investment Corporation 620 and 168 Construction Development Investment JSC.

The 705m bridge connecting the city’s districts 2 and 7 is expected to have a vertical clearance of 45m above the Saigon River, similar to that of the cable-stayed Phú Mỹ Bridge, opened after two years of construction in 2009.

The six-lane Phu My Bridge was built by a consortium consisting of Baulderstone, Bilfinger Berger, 1388 Freyssinet International and the Vietnamese concrete and formwork company CC620. The bridge designer was the French consultant Arcadis and approach road designer was Cardno. Project manager was 1397 AECOM. The main span is 380m long and the bridge has a 27m-wide main span deck.

While the city is not located on the coast, bridges must still be high enough to allow passage of large ships navigating inland along the Saigon River, making bridges costly, the Ministry of Transport reportedly said.

The new bridge is part of a larger plan to make transport and shipping more efficient in Vietnams largest city by population and the country’s economic capital. Between 2020-2030, 11 ports and piers handling ships up to 30,000tonnes on the Saigòn River will be relocated. New road layouts will be constructed for the piers.

More than 10 million live in Ho Chi Minh’s metropolitan area.

For more information on companies in this article

Related Content

  • Chile's challenging bridge and tunnel construction
    February 27, 2012
    SACYR Chile is constructing a bridge on the new Northeast Access Highway in the capital Santiago, and when complete the 22.5km route will link the suburbs of Vitacura and Colina to the city. Acceso Nororiente, opening this year, is the fifth urban freeway in Santiago and stands out because of the challenges in the construction of its bridges ands tunnels.
  • Innovative formwork solution to bridge construction
    February 20, 2012
    Innovative solutions are being applied to the construction of bridge structures as Patrick Smith reports. RMD Kwikform Iberica has engineered and supplied specialist formwork and falsework for construction of the much-needed Monteporreiro Viaduct in northern Spain. The viaduct will connect Monteporreiro with the Benedictine Monastery of San Bieito Lérez on the other side of the river, and in the process will ease congestion in the nearby town of Pontevedra, diverting some 5,000 vehicles/day.
  • The world’s longest suspension bridge
    June 24, 2024
    The world’s longest suspension bridge is the 1915 Çanakkale Bridge in Turkey. This engineering marvel links Gelibolu with Lapseki, forming a key section of the 101km highway linking Malkara with Çanakkale. *Article produced in partnership with the General Directorate of Highways (KGM), Ministry of Transport and Infrastructure, Republic of Türkiye.
  • Portugal and Spain to revamp a bridge over the border river Guadiana
    September 22, 2015
    The Portuguese road operator Infraestruturas de Portugal is to tender a €13 million contract for refurbishment of the international bridge over the Guadiana river, connecting Vila Real de Santo Antonio in Portugal and Ayamonte in Spain. The work will take 18 months and the cost will be shared by both countries, a report in Diário Económico said. Around 80% of the river is in Portugal. The river flows east to west through Spain, then south through Portugal, then forming the Spanish-Portuguese border